Inquiry
Form loading...
Waterbased Polyurethane Elastic Top Coat for Waterproofing - China Suppliers & Factory Solutions
Hot Products

Waterbased Polyurethane Elastic Top Coat for Waterproofing - China Suppliers & Factory Solutions

Discover high-quality products sourced from reputable China suppliers and factories. Our extensive range features innovative solutions designed to meet your specific needs. Partnering with trusted manufacturers in China, we ensure that you receive the finest craftsmanship and durability. Whether you are looking for bulk orders or customized products, our network of suppliers and factories is ready to fulfill your requirements efficiently. Explore our offerings today and experience the excellence that comes from reliable China suppliers and manufacturers

    Characteristics of the Product

    • High hardness, strong scratch resistance, has a certain flexibility
    • No solvent, no pollution, non-toxic harm
    • Resistance to acid, alkali and chemicals
    • Wear resistance, pressure resistance, high temperature resistance, yellowing
    • Resistance, waterproof and moisture-proof, fire prevention and other comprehensive performance is the best

    Product Parameters

    Item Number SQM-A01B02
    Surface Gloss Semi-light
    Component Two
    Suggested thickness of the dry film layer 150-200 µm
    Water resistance No change in 30 days
    The substrate temperature (℃) 15-25
    Surface drying time (H) 2
    Real dry (H) 24

    Applications

    Suitable Base Surfaces:
    Suitable for PVC, silicon PU, polyurea and other base surface, to provide good strength and adhesion.
    Recommended Locations:
    Laboratory, research and development room, pharmaceutical factory, cigarette factory, subway station, railway station, schools, hospitals, airports, passenger transport center and other public places.

    Packing

    Component A (main agent): 18.75kg
    Component B (curing agent): 1.25kg

    Storage & Safety

    This product should be stored in a cool, dry, ventilated indoor warehouse, storage period for half a year.

    Safety: Prohibit all fire sources in coating coating and construction site, and maintain good ventilation. Construction personnel must wear protective equipment to prevent the inhalation of paint mist and damage to the eyes and skin. Base coating splash on the skin should be immediately cleaned with soapy water, splash into the eyes, should be immediately washed with a lot of water, and then find a doctor to check.

    Construction Conditions

    Coating temperature range 5-35℃, relative humidity below 80%, temperature and humidity should be measured near the substrate. When the surface temperature of the substrate is higher than 40℃, it is recommended not to paint the construction.

    Rain, snow, wind and sand and other severe weather, can not be painted.

    Operation Methods and Requirements

    The substrate needs to be polished, no dust and oil pollution.

    Construction Instructions

    Apply to PVC, polyurea, silicon PU
    Construction method Traditional spraying, rolling coating
    Mixing ratio, weight ratio A: B = 15:1 (Construction after 5 minutes of mixing)

    Frequently Asked Questions

    What are the main performance characteristics of this product?

    This product offers high hardness, strong scratch resistance, and flexibility. It is solvent-free, non-toxic, and highly resistant to acids, alkalis, chemicals, wear, pressure, high temperatures, yellowing, water, moisture, and fire.

    What is the mixing ratio and how should it be applied?

    The weight mixing ratio is Component A to Component B = 15:1. After mixing thoroughly, let it stand for 5 minutes before construction. It can be applied using traditional spraying or rolling coating methods.

    What are the environmental requirements for construction?

    Construction should be performed within a temperature range of 5-35℃ and relative humidity below 80%. Do not apply if the substrate surface temperature exceeds 40℃, or during severe weather such as rain, snow, strong winds, and sandstorms.

    How should the substrate be prepared before coating?

    The substrate surface must be fully polished, completely clean, and free of any dust, oil, or other contaminants to ensure proper adhesion.

    What are the drying times and suggested thickness?

    The suggested dry film layer thickness is 150-200 µm. The surface drying time is approximately 2 hours, and it takes 24 hours to dry completely (real dry time).

    How should the product be stored and what safety measures are required?

    Store in a cool, dry, ventilated indoor warehouse for up to half a year. Prohibit all fire sources on site and ensure good ventilation. Workers must wear protective equipment. If splashed on skin, clean with soapy water immediately; if in eyes, flush with water and seek medical attention.