Inquiry
Form loading...
Water-Based Rigid Polyurethane Surface Coating for Industrial Floors - China Suppliers & Factory
Hot Products

Water-Based Rigid Polyurethane Surface Coating for Industrial Floors - China Suppliers & Factory

Discover our high-quality products sourced directly from trusted suppliers in China. Our factory utilizes advanced techniques and rigorous quality control to ensure that each item meets the highest standards. We take pride in our competitive pricing and commitment to customer satisfaction. By choosing our products, you not only support a reliable supply chain but also engage with a reputable Chinese factory that prioritizes excellence. Explore our diverse range of offerings today and experience the benefits of working with leading suppliers in China

    Characteristics of the Product

    • ● High hardness, strong scratch resistance, high pollution resistance
    • ● Make the substrate color bright, waterproof, resistant to yellowing
    • ● Strong wear resistance, high resistance to pollution, can be repeatedly washed with water
    • ● No radiation, green environmental protection, high pressure resistance, good ultraviolet light resistance
    • ● Fast construction and economical cost

    Product Parameters

    Item Number SQM-A01B02
    Surface Gloss Semi-light
    Component Two
    Pencil Hardness ≥ 3H
    5% H₂SO₄ No change in 7 days
    % NaOH No change in 7 days
    Suggested Thickness of the Dry Film Layer 150–200 µm
    Water Resistance No change in 30 days
    Substrate Temperature (℃) 15–25
    Surface Drying Time (H) 2
    Real Dry (H) 24

    Applications

    Applicable to the floor, color sand floor, marble floor, road surface color change, etc.

    Laboratory, research and development room, pharmaceutical factory, parking lot, subway station, supermarket, warehouse, heavy-load industrial plant, etc.

    polyurethane surface coat (2)
    polyurethane surface coat (4)
    polyurethane surface coat (5)

    Packing

    Component A (Main Agent) — 18.2 kg
    Component B (Curing Agent) — 1.8 kg

    Storage

    This product should be stored in a cool, dry, ventilated indoor warehouse. Storage period: half a year.

    Safety: Strictly prohibit all fire sources for bottom coating ingredients and construction site, and maintain good ventilation. Construction personnel must wear protective equipment to prevent the inhalation of paint mist and damage to the eyes and skin. Base coating splash on the skin should be immediately cleaned with soapy water. If splashed into the eyes, immediately wash with a large amount of water, then seek medical attention.

    Construction Conditions

    Coating temperature range 5–35℃, relative humidity below 80%. Temperature and humidity should be measured near the substrate. When the surface temperature of the substrate is higher than 40℃, it is recommended not to proceed with painting. Rain, snow, wind, sand, and other severe weather conditions — painting is not permitted.

    Operation Methods and Requirements

    Coating temperature range 5–35℃, relative humidity below 80%. Temperature and humidity should be measured near the substrate. When the surface temperature of the substrate is higher than 40℃, it is recommended not to proceed with painting. Rain, snow, wind, sand, and other severe weather conditions — painting is not permitted.

    Construction Instructions

    • Apply to: Wear-resistant floor, wall, cement
    • Construction Method: Traditional spraying, rolling coating
    • Mixing Ratio (Weight): A : B = 10 : 1  (Construction after 5 minutes of mixing)

    Frequently Asked Questions (FAQ)

    Q What surfaces is this polyurethane surface coat suitable for?
    This product is suitable for wear-resistant floors, color sand floors, marble floors, road surfaces, laboratory floors, pharmaceutical factory floors, parking lots, subway stations, supermarkets, warehouses, and heavy-load industrial plants.
    Q What is the mixing ratio of Component A and Component B?
    The mixing ratio by weight is A : B = 10 : 1. After mixing, wait 5 minutes before beginning construction to ensure proper activation of the curing agent.
    Q How long does it take for the coating to dry completely?
    The surface drying time is approximately 2 hours. Full cure (real dry) is achieved within 24 hours under normal conditions (substrate temperature 15–25℃).
    Q What are the recommended construction temperature and humidity conditions?
    The recommended coating temperature range is 5–35℃ with a relative humidity below 80%. Avoid construction when the substrate surface temperature exceeds 40℃ or during rain, snow, wind, or sandstorm conditions.
    Q How should this product be stored and what is its shelf life?
    Store the product in a cool, dry, and well-ventilated indoor warehouse away from all fire sources. The shelf life is half a year (6 months) from the date of manufacture.
    Q What safety precautions should be taken during application?
    All fire sources must be strictly prohibited at the construction site. Workers must wear appropriate protective equipment to prevent inhalation of paint mist and contact with skin or eyes. If the coating contacts skin, wash immediately with soapy water. If it enters the eyes, rinse thoroughly with large amounts of water and seek medical attention promptly.