To be a century-old enterprise, to be the world's respect for China's manufacturing products
Inquiry
Form loading...
Solvent-Free Epoxy Primer for Floors - High Penetration & Sealing Performance | China Suppliers & Factory
Hot Products

Solvent-Free Epoxy Primer for Floors - High Penetration & Sealing Performance | China Suppliers & Factory

Introducing DT-04, a high-performance, solvent-free primer developed by leading China suppliers and manufactured in our state-of-the-art factory. This two-component primer, consisting of component A and component B, boasts low viscosity and an irritating odor that dissipates quickly, ensuring a safe working environment. With an extended open time, DT-04 exhibits exceptional penetration and sealing properties on a variety of base surfaces, promoting outstanding interlayer adhesion. Trust our factory's expertise and choose DT-04 for reliable and effective priming solutions

    Application

    Workshop floors, garage parking lots, sports stands, pools, warehouses, storage tanks, etc.
    DT04 (1)
    DT04 (1)
    DT04 (1)
    DT04 (2)
    DT04 (3)
    DT04 (4)

    Product Parameters

    Primer A component
    Characteristics Unit Value / Description
    Appearance - Colorless or slightly yellow transparent liquid
    Flash point ℃ 150
    Viscosity (25℃) mPa•S ≤ 1000
    Density (25℃) g/ml About 1.0
    Primer B component
    Characteristics Unit Value / Description
    Appearance - Brown liquid
    Viscosity (25℃) mPa•S ≤ 1 000
    Density (25℃) g/ml 1.10 ~ 1.60

    Construction Parameters

    Parameter Details
    Surface treatment Construction can be carried out after the substrate has been properly treated.
    Mixing ratio (weight ratio) Customers must stir evenly before use. Primer A component: Primer B component = 2:1 (weight ratio)
    Theoretical coating rate For a 0.1mm thick dry coating, roller coating requires 0.15-0.2Kg/m² of paint, and spray coating requires 0.2-0.3Kg/m².
    Operation time 40-60 minutes
    Cleaning agent Special diluent
    Drying time Surface drying: less than 6 hours; through drying: less than 24 hours.
    Re-coating interval The next step can only be carried out after confirming that the coating has dried.

    Main performance indicators of paint film

    Project Unit Technical indicators Test Standards
    Dry time h ≤ 6 GB/T 1728
    Working time h ≤ 24 -
    Pull-off adhesion MPa ≥ 2.5 concrete GB/T 5210

    Drying time

    Substrate Temperature (℃) Surface Dry (h, max) Through Dry (h, max) Recoating Interval
    23 8 24 Min. 8 h, no upper limit

    Construction conditions

    • Painting environment temperature range: 5~35℃. The base surface temperature is at least 5℃ higher than the air dew point temperature.
    • Painting environment humidity range: 30~80%.
    • Ventilation conditions: Ensure that the construction site is well ventilated and dust-free, and there should be supervisors in confined spaces.
    • Note: The paint must be mixed evenly in strict accordance with the proportion marked on the certificate.

    Construction method

    • Spraying: Use conventional spraying or airless spraying. It is recommended to use airless spraying for large-scale construction.
    • Roller coating: Use for large-scale construction.
    • Brush coating: Use for small areas. Use a soft-bristled brush or roller brush.

    Packaging specification

    Iron drum packaging. DT-04 A: 20 kg/drum | DT-04 B: 10 kg/drum

    Storage

    This product should be stored in a cool, dry, ventilated indoor warehouse, storage period of half a year.

    Safety

    All fire sources are strictly prohibited in the batching and construction sites, and good ventilation is maintained. Lacquer splash on the skin should be washed immediately with soapy water, splash into the eyes, should be immediately washed with plenty of water, and then find a doctor to check.

    Construction steps

    First step clean the foundation, fill in the gaps
    First step: clean the foundation, fill in the gaps
    Second Step, Roll primer
    Second Step: Roll primer
    Third step self-leveling cold polyurea floor construction
    Third step: self-leveling cold polyurea floor construction
    Forth step Brush waterbased PU top coat
    Forth step: Brush waterbased PU top coat

    Frequently Asked Questions (FAQ)

    What is the mixing ratio for DT-04 primer?
    The weight mixing ratio is Primer A component : Primer B component = 2:1. It must be stirred evenly before use.
    What is the theoretical coating rate for DT-04?
    For a 0.1mm dry coating thickness, roller coating requires 0.15-0.2 Kg/m² of paint, while spray coating requires 0.2-0.3 Kg/m².
    How long does the primer take to dry and what is the re-coating interval?
    At 23℃, the surface drying time is less than 6 hours (maximum 8 hours) and through drying is less than 24 hours. The minimum re-coating interval is 8 hours, and there is no upper limit.
    What are the recommended application methods?
    You can use conventional or airless spraying (recommended for large-scale construction), roller coating, or brush coating (recommended for small areas with a soft-bristled brush).
    Under what environmental conditions can DT-04 be applied?
    The environment temperature should be between 5~35℃, and the humidity range should be 30~80%. The substrate surface temperature must be at least 5℃ higher than the air dew point.
    What are the storage and shelf life requirements?
    This product should be stored in a cool, dry, and ventilated indoor warehouse. The standard storage period is half a year.