Inquiry
Form loading...
Solvent Free Epoxy Primer for Floor Coatings with Strong Sealing Performance
Products

Solvent Free Epoxy Primer for Floor Coatings with Strong Sealing Performance

DT-04 is a solvent-free, non-volatile irritating odor, long open time, two-component high penetration primer, including component A and component B. It has low viscosity , has excellent penetration and sealing effect on the base surface , and provides good interlayer adhesion.

    Application

    Workshop floors, garage parking lots, sports stands, pools, warehouses, storage tanks, etc.
    DT04 (1)
    DT04 (1)
    DT04 (1)
    DT04 (2)
    DT04 (3)
    DT04 (4)

    Product Parameters

    Primer A component

    Characteristics

    Unit

    Colorless or slightly yellow transparent liquid

    Flash point

    ℃

    150

    Viscosity (25℃)

    mPa•S

    ≤ 1000

    Density (25℃)

    g/ml

    About 1.0

    Primer B component

    Characteristics

    unit

    Brown liquid

    Viscosity (25℃)

    mPa•S

    ≤ 1 000

    Density (25℃)

    g/ml

    1.10 ~ 1.60

    Construction Parameters

    Surface treatment

    Construction can be carried out after the substrate has been properly treated.

    Mixing ratio (weight ratio)

    Customers must stir evenly before use

    Primer A component: Primer B component = 2:1 (weight ratio)

    Theoretical coating rate

    For a 0.1mm thick dry coating, roller coating requires 0.15-0.2Kg/m2 of paint, and spray coating requires 0.2-0.3Kg/m2.

    Operation time

    40-60 minutes

    Cleaning agent

    Special diluent

    Drying time

    Surface drying: less than 6 hours; through drying: less than 24 hours.

    Re-coating interval

    The next step can only be carried out after confirming that the coating has dried.

    Main performance indicators of paint film

    Project

    Technical indicators

    Test Standards

    Dry time

    h

    ≤ 6

     

    GB/T 1728

    Working time

    h

    ≤24

     

    Pull-off adhesion

    MPa

    ≥2.5 concrete

    GB/T 5210

    Drying time

    Substrate Temperature (℃)

    Surface Dry

    (h, max)

    Through Dry

    (h, max)

    Recoating Interval

    23

    8

    24

    Min. 8 h, no upper limit

    Construction conditions

    Painting environment temperature range: 5~35℃. The base surface temperature is at least 5℃ higher than the air dew point temperature; Painting environment humidity range: 30~80%;
    Ventilation conditions: Ensure that the construction site is well ventilated and dust-free , and there should be supervisors in confined spaces .
    Note : The paint must be mixed evenly in strict accordance with the proportion marked on the certificate;

    Construction method

    Spraying: Use conventional spraying or airless spraying. It is recommended to use airless spraying for large-scale construction.
    Roller coating: Use for large-scale construction.
    Brush coating: Use for small areas. Use a soft-bristled brush or roller brush.

    Packaging specification

    Iron drum packaging. DT-04 A: 20 kg/drum DT-04 B: 10 kg/drum

    Storage

    This product should be stored in a cool, dry, ventilated indoor warehouse, storage period of half a year. 

    Safety

    All fire sources are strictly prohibited in the batching and construction sites, and good ventilation is maintained. Lacquer splash on the skin should be washed immediately with soapy water, splash into the eyes, should be immediately washed with plenty of water, and then find a doctor to check.
    Construction steps
    图片1
    First step   clean the foundation, fill in the gaps
    图片2
    Second Step, Roll primer
    图片3
    Third step  self-leveling cold polyurea floor construction
    图片4
    Forth step Brush waterbased PU top coat