Inquiry
Form loading...
Anti-Yellowing One-Component Polyurethane Adhesive For  EPDM Sports Surfaces
Sports Track And Field

Anti-Yellowing One-Component Polyurethane Adhesive For EPDM Sports Surfaces

This product is an anti-yellowing single-component polyurethane adhesive. It is produced by reacting isocyanates and polyether polyols at a specific ratio, together with selected additives.
The product is specially developed to solve the yellowing problem of EPDM sports surfaces. Its anti-yellowing performance is especially noticeable on colored surfaces. The product can achieve 100% adhesive content, offering excellent performance and outstanding resistance to yellowing.

    Characteristics of the product

    • Cures at room temperature.
    • Excellent physical and chemical properties, strong adhesion, good weather resistance, and superior anti-yellowing performance.
    • Easy application with high construction efficiency; designed thickness can be achieved in a single application.

    Product Parameters

    Test item

    Index

    Physical indicators

    NCO content(%)

    3.55±0.2

    Appearance(20℃)

    Pale yellow viscous liquid

    Operation time(min/25℃)

    60-90min

    Usage temperature(℃)

    Ambient temperature

    Surface drying time(h/25℃)

    6-8

    Solidification time(h/25℃)

    24-48

    Physical indicators

    Viscosity(MPa.S/30℃)

    2500-3000

    Tensile strength(MPa,20% rubber content EPDM granules )

    ≥0.4

    Elongation at break(%,20% rubber content EPDM granules)

    ≥40

    Applications

    • Base adhesive for permeable running tracks
    • EPDM sports surfaces
    Polyurethane adhesive PU binder (3)
    Polyurethane adhesive PU binder (4)
    Polyurethane adhesive PU binder (5)

    Packing

    200kgs/drum

    Storage

    Sealed storage of coatings in dry, cool, and well ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.

    Construction conditions

    1)Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
    2)Environmental temperature and humidity requirements: The environmental temperature at the construction site should be above 5 ℃, and construction can only be carried out when the relative humidity is less than 85%
    3)Ventilation conditions: Ventilation should be maintained during construction.

    Operation methods and requirements

    a. Select materials.
    b. Recommended ratio of single square dosage: ≥0.9 kg glue, 1 ~ 1.1 kg 0.5-2mm size granules, 0.3 ~ 0.4 kg rubber powder, 0.06 kg color paste.
    c. The granules size is recommended by 0.5-2mm. When the glue temperature is low in winter, the viscosity problem is solved by heating the glue to ensure the covering and bond strength. First the glue and color paste fully stir evenly, and then add granules and red rubber powder fully stir evenly, combined with the site situation can be appropriate to add an appropriate amount of environmental protection diluent to adjust the construction viscosity, can not be adjusted too thin, to prevent the material from penetrating into the particles and excessive atomization when spraying, the granules surface of the slurry packaging less resulting in future granules.
    d. After mixing evenly, spray once in both directions.

    Suggested use qty 

    Single square meter dosage ≥1.3kg