Pure Polyurea High Content Spray Polyurea for High Wear-Resistance
Product Parameters
|
Test Item |
Technical Index |
|
Hardness (Shore D) |
≥60 |
|
Adhesion (Pull-off Method), MPa |
> 5 |
|
Water Resistance (Immersed in boiling water for 8 h) |
No change |
|
Alkali Resistance (Immersed in 20% NaOH solution for 7 days) |
No change |
|
Acid Resistance (Immersed in 10% HCl solution for 8 h) |
No change |
Basic Technical Parameters
|
Item |
Index |
|
Surface Gloss |
Low gloss |
|
Color |
Grey |
|
Specific Gravity |
1.1–1.3 |
|
Solid Content |
≥99% |
|
Recommended Dry Film Thickness |
1–1.5 mm |
|
Gel Time |
≤8 s |
|
Tear Strength |
≥100 N/mm |
|
Surface Dry Time |
≤30 s |
|
Tensile Strength |
≥20 MPa |
|
Elongation at Break |
≥260% |
General Construction Description
Suitable for steel, cement, concrete and other structural substrates.
Construction Method
Specialized spraying equipment spraying
Mixing Ratio (Weight Ratio)
A : B = 1.1 : 1
Drying time
|
Substrate Temperature (℃) |
Surface Dry (h, max) |
Through Dry (h, max) |
Recoating Interval |
|
23 |
≤30 |
≤4 |
Min: 20 s, no upper limit |
Substrate Surface Treatment
Steel substrate: Sandblasting or pickling treatment
Concrete substrate: Thorough cleaning to remove oil and contaminants
Primer pretreatment is required for all substrates
Construction Conditions
1.Applicable temperature range: -10 ℃ ~ 50 ℃
2.Relative humidity ≤ 85%
3.Substrate surface temperature shall be at least 10 ℃ above dew point
4.Measure temperature and humidity close to the substrate surface
5.Do not construct under harsh weather such as rain, snow, strong wind or sandstorm
Packaging Specification
Component A: 220 kg/drum
Component B: 200 kg/drum
Storage Requirements
Store indoors in cool, dry and well-ventilated warehouse. The shelf life under normal room temperature is 1 year.
Safety & Labor ProtectionRecommended Consumption
1.All ignition sources are strictly forbidden near materials and construction areas; keep sufficient ventilation all the time.
2.Spraying operators must wear complete protective gear to avoid inhaling paint mist, which may cause eye irritation and skin damage.
Construction steps

First step clean the foundation, fill in the gaps

Second Step, Roll primer

Third step self-leveling cold polyurea floor construction

Forth step Brush waterbased PU top coat