Inquiry
Form loading...
One-Component Polyurethane Waterproof Coating Exposed Hand-Applied Polyurea
Products

One-Component Polyurethane Waterproof Coating Exposed Hand-Applied Polyurea

YP-722 is a one-component, moisture-curing waterproof coating suitable for walls, roofs, and other building substrates. It offers excellent weather resistance and can be applied as an exposed coating.

    Characteristics of the product

    ■Contains high-strength and elastic elongation polymers, which significantly improve material properties and have high physical and chemical properties, mechanical properties and chemical stability.  
    ■excellent ductility and strength, with a tensile strength of up to 6MPa and an elongation at break of up to 400%.  
    ■Eazy to use, color won’t change

    Product Parameters

    Item

    Index

    Adhesion (Pull-off Method), MPa

    >2

    Water Resistance (Immersed in boiling water for 4 h)

    No change

    Alkali Resistance (Immersed in 3% NaOH solution for 7 days)

    No change

    Acid Resistance (Immersed in 2% HCl solution for 7 days)

    No change

    Water Impermeability

    Impermeable under 0.4 MPa for 2 hours

    Basic Parameters (25°C, 55% Relative Humidity)

    Parameter

    Specification

    Parameter

    Specification

    Color

    White/Light Gray

    Specific Gravity

    1.3-1.4g/cm³

    Surface Gloss

    High Gloss

    Surface Drying Time

    ≤8h

    Component

    Single-component

    Hard Drying Time

    ≤24h

    Solid Content

    ≥85%

    Tensile Strength

    5-6MPa

    Recommended Total Dry Film Thickness

    1-2mm

    Elongation at Break

    ≥450%

    Tear Strength

    35N/mm

    -

    -

    Application Scope & Construction Method

    Applicable to cement, concrete, ceramic and other base surfaces. Traditional roller coating or scraping are available construction methods.
    722 (3)
    722 (4)
    722 (8)

    Drying time

    Substrate Temperature (℃)

    Surface Dry

    (h, max)

    Through Dry

    (h, max)

    Recoating Interval

    23

    8

    24

    Min. 8 h, no upper limit

    Surface Preparation

    The substrate surface shall be clean, free of oil, dust and other contaminants, flat and dry. Primer pretreatment is required in advance.

    Environmental conditions

    1.Coating ambient temperature: 0–50°C; relative humidity below 65%.
    2.Substrate surface temperature shall be at least 10°C above dew point.
    3.Temperature and humidity shall be measured close to the substrate.
    4.Do not apply coating under harsh weather such as rain, snow, strong wind or sandstorm.

    Packaging Specification

    10 kg per drum

    Storage 

    This product should be stored in a cool, dry, ventilated indoor warehouse, storage period of half a year. 

    Safety

    All fire sources are strictly prohibited in the batching and construction sites, and good ventilation is maintained. Lacquer splash on the skin should be washed immediately with soapy water, splash into the eyes, should be immediately washed with plenty of water, and then find a doctor to check.
    Construction steps
    图片1
    First step   clean the foundation, fill in the gaps
    图片2
    Second Step, Roll primer
    图片3
    Third step  self-leveling cold polyurea floor construction
    图片4
    Forth step Brush waterbased PU top coat