One Component Brushable Cold Polyurea from China Suppliers and Factory - YP686 Elastic Coating Material
YP686 is a premium-grade, one-component brushable polyurea elastic material, expertly crafted in China by leading suppliers in the industry. This innovative product is formulated with a precise balance of isocyanates and amine substances, enhanced with silicon reinforcing agents to ensure superior performance. YP686 boasts exceptional mechanical properties, excellent leveling, and a seamless, dense coating that ensures durability and aesthetics. As a trusted factory product, it provides reliable, continuous film formation, making it both beautiful and practical for various applications
Excellent physical and chemical properties, with good adhesion to various substrates.
Convenient construction, extremely high efficiency, can achieve the design thickness requirements (hundreds of micrometers to several centimeters) in one construction.
Good leveling performance, overall film formation, dense and seamless coating.
Using manual scraping or roller coating construction, professional, convenient, and controllable.
Product Parameters
Item Number
YP686
Solid Content %
93
Appearance
Grey color liquid
Mix Temperature
Normal temperature
Work Time (min)
30–35
Surface Dry Time (h)
<4
Actual Dry Time (h)
<24
Hardness (Shore A)
60±2
Tensile Strength (MPa)
2
Elongation at Break (%)
200
Applications
Roof waterproofing, villa platform, terrace and other waterproofing protection.
Packing
📦10 kgs/drum or 20 kgs/drum.
Storage
🏪Sealed storage of coatings in dry, cool, and well ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.
Construction Conditions
1
Base Surface Requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
2
Environmental Temperature & Humidity: The environmental temperature at the construction site should be above 5℃, and construction can only be carried out when the relative humidity is less than 85%.
3
Ventilation Conditions: Ventilation should be maintained during construction.
Operation Methods and Requirements
YP686 can be opened for direct construction.
During construction, in order to ensure interlayer adhesion, polishing treatment should be carried out (note: polishing floating dust must be cleaned with a vacuum cleaner). Roll coat solvent-free epoxy sealing primer. After the primer is completely cured, pour YP686 polyurea onto the floor and scrape it evenly with a trowel (3mm or 5mm trowel can be selected according to thickness requirements). After curing, proceed to the next process. Curing at room temperature for 12 hours, if encountering adverse weather such as rain after coating, a layer of interface agent must be applied before proceeding to the next process.
Under normal circumstances, the paint film should be cured for at least 7 days after completion of painting to ensure optimal performance of the paint film.
Suggested Use QTY
1.2 kg/mm/m² — Waterproof national standard thickness 1.5mm, single square usage: 1.8 kg.
Construction Steps:
1
First step: Clean the foundation, fill in the gaps
2
Second Step: Roll primer
3
Third Step: One component polyurea construction
4
Fourth Step: Brush waterbased PU top coat
❓
Frequently Asked Questions (FAQ)
Q1
What is YP686 one-component polyurea coating and what makes it different from two-component polyurea?
YP686 is a single-component, moisture-curing polyurea waterproof coating with 93% solid content. Unlike two-component systems, it requires no mixing equipment and can be applied directly from the drum, significantly simplifying the construction process while maintaining excellent physical and chemical performance.
Q2
What surfaces is YP686 polyurea coating suitable for?
YP686 is suitable for concrete base surfaces with a strength of C25 or above and moisture content below 8%. It is widely used for roof waterproofing, villa platforms, terraces, and other areas requiring reliable waterproof protection. It adheres well to a variety of substrates.
Q3
How long does YP686 take to cure, and when can the next construction step begin?
YP686 has a surface dry time of less than 4 hours and a full dry time of less than 24 hours at room temperature. For optimal interlayer adhesion, curing for 12 hours at room temperature is recommended before proceeding to the next step. The complete paint film should cure for at least 7 days to achieve peak performance.
Q4
What are the recommended environmental conditions for applying YP686?
Construction should be carried out when the ambient temperature is above 5℃ and relative humidity is below 85%. Adequate ventilation must be maintained throughout the application process. Avoid applying the coating in rainy or excessively humid conditions.
Q5
How much YP686 polyurea is needed per square meter, and how is it applied?
The standard usage rate is 1.2 kg per mm per m². For the waterproof national standard thickness of 1.5mm, approximately 1.8 kg per square meter is required. YP686 can be applied using manual scraping with a trowel (3mm or 5mm) or roller coating, making it efficient and easy to control on-site.
Q6
How should YP686 polyurea coating be stored to maintain its quality?
YP686 should be stored in sealed drums in a dry, cool, and well-ventilated environment, away from direct sunlight, rain, and any sources of ignition or fire. Proper sealed storage ensures the product maintains its performance throughout its shelf life.