Inquiry
Form loading...
Hot Spray Polyurea for Waterproofing, Surface Protection, and Industrial Floors
Products

Hot Spray Polyurea for Waterproofing, Surface Protection, and Industrial Floors

Spray polyurea waterproof coating SII is a two-component elastic coating for professional spraying, consisting of Component A and Component B.

● Component A: Semi-prepolymer synthesized by isocyanate and oligomer diol / triol.

● Component B: Composed of amino-terminated resin, hydroxyl-terminated resin, amine chain extender, pigments and functional additives.

Complete elastic polyurea film is formed via on-site spraying with dedicated spraying equipment. The material features outstanding mechanical strength, medium resistance, outdoor weathering resistance and superior substrate adhesion.

    Characteristics of the product

    1.Ultra-fast curing; continuous spraying available on curved surfaces, vertical walls and top surfaces without sagging.
    2.Excellent waterproof performance to fully isolate substrates from water erosion.
    3.Outstanding physical & chemical properties, strong adhesion to various base materials.
    4.High construction efficiency; designed thickness can be achieved in one single pass.
    5.Integral, dense and seamless coating film.
    6.Mechanized spraying construction with stable, controllable film quality.
    7.Solvent-free & heavy-metal-free, eco-friendly formula.
    8.100% solid content, zero VOC emission.
    9.Wide service temperature range: -45 ℃ ~ 150 ℃.
    10.Continuous compact seamless film, practical and attractive appearance.

    Product Parameters

    No.

    Test Item

    Technical Requirement

    Test Result

    1

    Solid Content (%)

    ≥98

    99

    2

    Gel Time (s)

    ≤45

    16

    3

    Surface Dry Time (s)

    ≤120

    20

    4

    Tensile Strength (MPa)

    ≥16.0

    16.24

    5

    Elongation at Break (%)

    ≥450

    460

    6

    Tear Strength (N/mm)

    ≥50

    66

    7

    Low-temperature Bending (℃)

    ≤-40

    -40

    8

    Water Impermeability

    0.4 MPa, impermeable for 2h

    Impermeable

    9

    Heating Elongation (%)

    Elongation / contraction ≤1.0

    0.4

    10

    Bond Strength (MPa)

    ≥2.5

    3

    11

    Water Absorption (%)

    ≤5.0

    0.5

    12

    Thermal Aging & Artificial Weathering Appearance

    No cracks & deformation

    No cracks & deformation

    13

    Thermal Aging Performance

     

     

     

    Tensile Strength Retention Rate (%)

    80–150

    97

     

    Elongation at Break (%)

    ≥400

    411

     

    Low-temperature Bending (℃)

    ≤-35

    -35, no crack

    14

    Alkali Resistance Performance

     

     

     

    Tensile Strength Retention Rate (%)

    80–150

    103

     

    Elongation at Break (%)

    ≥400

    413

     

    Low-temperature Bending (℃)

    ≤-35

    -35, no crack

    15

    Acid Resistance Performance

     

     

     

    Tensile Strength Retention Rate (%)

    80–150

    99

     

    Elongation at Break (%)

    ≥400

    410

     

    Low-temperature Bending (℃)

    ≤-35

    -35, no crack

    16

    Salt Resistance Performance

     

     

     

    Tensile Strength Retention Rate (%)

    80–150

    97

     

    Elongation at Break (%)

    ≥400

    409

     

    Low-temperature Bending (℃)

    ≤-35

    -35, no crack

    17

    Artificial Weathering Performance

     

     

     

    Tensile Strength Retention Rate (%)

    80–150

    83

     

    Elongation at Break (%)

    ≥400

    408

     

    Low-temperature Bending (℃)

    ≤-35

    -35, no crack

    18

    Hardness (Shore A)

    ≥80

    85

    19

    Abrasion Loss (750g/500r, mg)

    ≤30

    1

    20

    Impact Resistance (kg·m)

    ≥1.0

    1.0 kg·m, intact

    Application Scope & Construction Method

    1.Chemical, petroleum & petrochemical industry: workshop floors, storage tanks, neutralization tanks, drainage trenches.
    2.Environmental facilities: landfill sites, sewage treatment tanks, waste gas filtration towers.
    3.Factory & warehouse floors: anti-corrosion and wear-resistant protection.
    4.Steel structures: metal pipelines, bridge decks, ship decks and platforms.
    5.Building waterproofing: roof waterproofing, exterior wall waterproofing & renovation.
    6.Municipal facilities: sports grandstands, anti-seepage wear-resistant flooring.
    7.Aquatic venues: water parks, swimming pools, aquaculture ponds.
    S II (1)
    S II (2)
    S II (7)
    S II (4)
    S II (5)
    S II (6)

    Packaging specification

    ●Component A: 220 kg per drum
    ●Component B: 210 kg per drum

    Storage

    1.Store in sealed, cool, dry and ventilated warehouse; avoid direct sunlight, rain and all ignition sources.
    2.Shelf life: 6 months under original sealed packaging and specified storage conditions.
    3.Expired material can be reused only if re-inspection meets all technical indexes.
    4.Use up quickly once opened; re-seal tightly for storage if unused.
    5.Solvent-free product, classified as non-hazardous goods for transportation.
    6.Strictly prevent rain, sunlight and violent collision during transit; stack materials neatly and stably, complying with transport regulations.

    Construction Conditions

    1.Substrate Requirements
    Concrete base shall be cleaned, leveled and polished to form proper roughness. Concrete curing must be fully completed with strength ≥ C25 and moisture content <8%. Proceed to next process immediately after substrate treatment.
    2.Ambient Temperature & Humidity
    ● Construction temperature: 5 ~ 35 ℃
    ● Substrate surface temperature shall be at least 5 ℃ higher than dew point
    ● Relative humidity: 30% ~ 80%
    ● Keep ventilation; stop construction under strong wind.

    Coating Method & Requirements

    1.Stir Component B thoroughly before use; volume mixing ratio A:B = 1:1.
    2.Professional spraying equipment is mandatory; material temperature controlled at 50 ~ 80 ℃ during spraying.
    3.Next process can be carried out after 12 hours curing. If interval exceeds 24 hours, apply interface agent before re-spraying.
    4.If rain occurs after coating, apply interface agent before subsequent construction.
    5.Full film curing time: minimum 7 days to achieve optimal comprehensive performance.

    Recommended Consumption

    Standard dosage: 1.2 kg per square meter per mm thickness
    National standard waterproof thickness 1.5 mm: 1.8 kg/㎡
    National standard anti-corrosion thickness 2.0 mm: 2.4 kg/㎡

    Safety & Labor ProtectionRecommended Consumption

    Read product manual and warning labels fully before operation; master construction specifications.
    No open flame, welding or smoking on construction site; maintain good ventilation.
    Although solvent-free, spray mist will be generated during spraying. Wear gas mask and full protective gear to avoid inhalation and direct skin contact.
    Flush splashed coating on skin with detergent, soap and plenty of clean water immediately. For eye splashes, rinse thoroughly with water and seek medical treatment promptly.
    Fully cured dry film is non-toxic under normal application conditions. For more details, please contact Shandong Century Union New Materials Technology Co., Ltd.
    Construction steps
    图片1
    First step   clean the foundation, fill in the gaps
    图片2
    Second Step, Roll primer
    图片3
    Third step  self-leveling cold polyurea floor construction
    图片4
    Forth step Brush waterbased PU top coat