High-Quality SPUA II Two-Component Spray Polyurea Waterproof Material from China Suppliers and Factory
Hot Products

High-Quality SPUA II Two-Component Spray Polyurea Waterproof Material from China Suppliers and Factory

Introducing our high-performance spray polyurea waterproof coating, available in models YP-637 and YP-65This advanced coating is a two-component elastic solution, expertly formulated from component A—a semi prepolymer created through the reaction of isocyanate with oligomer Diol or ternary alcohol—and component B, which includes amino terminated resin, hydroxyl terminated resin, amine chain extender, pigments, and additives. As a leading China supplier and factory, we ensure that our elastic polyurea material is applied on-site using professional equipment for superior results. This product boasts exceptional mechanical properties, impressive medium resistance, outstanding outdoor aging resistance, and superior adhesion. Trust our spray polyurea waterproof coating for durability and reliability in your projects.

    Characteristics of the Product

    • The addition of urea group polymer with crosslinker and terminal amino polyols can significantly improve the material performance
    • Suitable for soaking and waterproof occasions
    • Does not contain harmful substances, and the paint film is non-toxic
    • Strong bonding force with a variety of materials (including metals, ceramics and composites)
    • Spraying molding, no flow hanging

    Product Parameters

    Serial Number Test Item Test Result
    1 Solid content ≥98%
    2 Gel time ≤20s
    3 Tensile strength ≥19 MPa
    4 Elongation ≥550%
    5 Tear strength ≥50 N/m²
    6 Adhesion (pull) MPa 5 MPa
    7 Alkaline resistance (immersed in 20% NaOH solution for 7 days) No change
    8 Water resistance (8h into boiling water) No change
    9 Acid resistance (immersed in 10% HCL solution for 7d) No change
    10 Hardness Shore A 90–95

    Applications

    Roof waterproofing, villa platform, terrace and other waterproofing protection
    Application - Roof Waterproofing
    Application - Villa Platform
    Application - Terrace Waterproofing
    Application 4
    Application 5
    Application 6

    Packing

    Component A: 220 kg   |   Component B: 210 kg

    Storage

    This product should be stored in a cool, dry, ventilated indoor warehouse with a storage period of one year.

    Construction Conditions

    Base Surface Requirements
    The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
    Environmental Temperature & Humidity Requirements
    The construction environment temperature should be between 5~35 ℃, and the base surface temperature should be at least 5 ℃ higher than the air dew point temperature. The humidity range should be between 30% and 80%.
    Ventilation Conditions
    Ventilation should be maintained during construction, but construction should not be carried out when there is strong wind.

    Painting Methods and Requirements

    Mixing Ratio
    Mix component B of the coating evenly before use.  A : B = 1 : 1 (volume ratio)
    Application Instructions
    Professional construction teams must use professional spraying equipment for construction, and the material temperature during spraying should be controlled between 50~80 ℃. In general, the next process can be carried out after 12 hours of painting. If the construction interval exceeds 24 hours, a layer of interface agent needs to be applied before construction can proceed. If encountering adverse weather such as rain after coating, a layer of interface agent must be applied before proceeding to the next process. Under normal circumstances, the paint film should be cured for at least 7 days after completion of painting to ensure the best performance of the paint film.

    Suggested Use QTY

    • 1.2 kg/mm/m²
    • Waterproof national standard thickness 1.5 mm — single square meter dosage: 1.8 kg
    • Anti-corrosion national standard thickness 2.0 mm — dosage: 2.4 kg
    Construction Steps
    Step 1 - Clean the foundation, fill in the gaps
    1 Clean the foundation, fill in the gaps
    Step 2 - Roll primer
    2 Roll primer
    Step 3 - SPUA II polyurea spray construction
    3 SPUA Ⅱ polyurea spray construction
    Step 4 - Brush waterbased PU top coat
    4 Brush waterbased PU top coat

    Frequently Asked Questions (FAQ)

    Q What is the mixing ratio of SPUA II polyurea coating?
    The mixing ratio of SPUA II polyurea coating is A : B = 1 : 1 by volume. Component B should be mixed evenly before use to ensure optimal performance.
    Q How long does SPUA II polyurea take to cure after application?
    The gel time is ≤20 seconds. In general, the next process can be carried out after 12 hours of painting. The paint film should be fully cured for at least 7 days after completion of painting to ensure best performance.
    Q What are the environmental conditions required for applying SPUA II polyurea?
    The construction environment temperature should be between 5–35 ℃. The base surface temperature should be at least 5 ℃ higher than the air dew point temperature. Relative humidity should be maintained between 30% and 80%. Adequate ventilation is required, but construction should be avoided during strong winds.
    Q What is the recommended dosage of SPUA II polyurea per square meter?
    The standard dosage is 1.2 kg/mm/m². For waterproofing applications at the national standard thickness of 1.5 mm, the dosage is 1.8 kg/m². For anti-corrosion applications at 2.0 mm thickness, the dosage is 2.4 kg/m².
    Q Is SPUA II polyurea resistant to chemicals and extreme conditions?
    Yes. SPUA II polyurea shows no change after immersion in 20% NaOH solution for 7 days (alkali resistance), after 8 hours in boiling water (water resistance), and after immersion in 10% HCL solution for 7 days (acid resistance). It is highly suitable for demanding waterproof and corrosion-resistant applications.
    Q What should be done if the construction interval exceeds 24 hours or it rains after coating?
    If the construction interval exceeds 24 hours, a layer of interface agent must be applied before continuing construction. Similarly, if adverse weather such as rain occurs after coating, a layer of interface agent must be applied before proceeding to the next process to ensure proper adhesion.