High Penetration Solvent-Free Epoxy Primer for Floors - Durable Sealing from China's Leading Suppliers and Factory
Hot Products

High Penetration Solvent-Free Epoxy Primer for Floors - Durable Sealing from China's Leading Suppliers and Factory

Introducing the DT-04, a high-performance, solvent-free primer that offers exceptional penetration and sealing capabilities. This two-component system, consisting of Component A and Component B, is designed for use on various base surfaces, ensuring optimal interlayer adhesion. With its low viscosity and long open time, DT-04 is perfect for those seeking a reliable solution without the irritation of volatile odors. Sourced from trusted China suppliers, our factory guarantees the highest quality standards for your construction and renovation needs. Experience the unmatched efficiency of DT-04 today!

    Application

    Workshop floors, garage parking lots, sports stands, pools, warehouses, storage tanks, etc.
    DT04 (1)
    DT04 (1)
    DT04 (1)
    DT04 (2)
    DT04 (3)
    DT04 (4)

    Product Parameters

    Primer A component
    Characteristics Unit Colorless or slightly yellow transparent liquid
    Flash point ℃ 150
    Viscosity (25℃) mPa•S ≤ 1000
    Density (25℃) g/ml About 1.0
    Primer B component
    Characteristics Unit Brown liquid
    Viscosity (25℃) mPa•S ≤ 1 000
    Density (25℃) g/ml 1.10 ~ 1.60

    Construction Parameters

    Surface treatment Construction can be carried out after the substrate has been properly treated.
    Mixing ratio (weight ratio) Customers must stir evenly before use
    Primer A component: Primer B component = 2:1 (weight ratio)
    Theoretical coating rate For a 0.1mm thick dry coating, roller coating requires 0.15-0.2Kg/m2 of paint, and spray coating requires 0.2-0.3Kg/m2.
    Operation time 40-60 minutes
    Cleaning agent Special diluent
    Drying time Surface drying: less than 6 hours; through drying: less than 24 hours.
    Re-coating interval The next step can only be carried out after confirming that the coating has dried.

    Main performance indicators of paint film

    Project Unit Technical indicators Test Standards
    Dry time h ≤ 6 GB/T 1728
    Working time h ≤24 -
    Pull-off adhesion MPa ≥2.5 concrete GB/T 5210

    Drying time

    Substrate Temperature (℃) Surface Dry (h, max) Through Dry (h, max) Recoating Interval
    23 8 24 Min. 8 h, no upper limit

    Construction conditions

    • Painting environment temperature range: 5~35℃. The base surface temperature is at least 5℃ higher than the air dew point temperature.
    • Painting environment humidity range: 30~80%.
    • Ventilation conditions: Ensure that the construction site is well ventilated and dust-free, and there should be supervisors in confined spaces.
    • Note: The paint must be mixed evenly in strict accordance with the proportion marked on the certificate.

    Construction method

    • Spraying: Use conventional spraying or airless spraying. It is recommended to use airless spraying for large-scale construction.
    • Roller coating: Use for large-scale construction.
    • Brush coating: Use for small areas. Use a soft-bristled brush or roller brush.

    Packaging specification

    Iron drum packaging. DT-04 A: 20 kg/drum, DT-04 B: 10 kg/drum.

    Storage

    This product should be stored in a cool, dry, ventilated indoor warehouse, storage period of half a year.

    Safety

    All fire sources are strictly prohibited in the batching and construction sites, and good ventilation is maintained. Lacquer splash on the skin should be washed immediately with soapy water, splash into the eyes, should be immediately washed with plenty of water, and then find a doctor to check.

    Construction steps

    First step clean the foundation, fill in the gaps
    First step: clean the foundation, fill in the gaps
    Second Step, Roll primer
    Second Step: Roll primer
    Third step self-leveling cold polyurea floor construction
    Third step: self-leveling cold polyurea floor construction
    Forth step Brush waterbased PU top coat
    Forth step: Brush waterbased PU top coat

    Frequently Asked Questions (FAQ)

    What are the main applications for DT-04?
    DT-04 is widely used for workshop floors, garage parking lots, sports stands, swimming pools, warehouses, storage tanks, and other similar industrial or commercial floorings.
    What is the mixing ratio of Primer A and B components?
    The mixing ratio is Primer A component : Primer B component = 2:1 by weight. It must be stirred thoroughly and evenly before application.
    What is the theoretical coating rate for this product?
    For a dry coating thickness of 0.1mm, roller coating requires approximately 0.15-0.2 Kg/m² of paint, while spray coating requires about 0.2-0.3 Kg/m².
    What are the environmental requirements for construction?
    The painting environment temperature should be between 5~35℃, and the base surface temperature must be at least 5℃ higher than the air dew point. The humidity range should be between 30~80% with good ventilation.
    How long does it take for the paint film to dry?
    At a substrate temperature of 23℃, the surface drying time is less than 6 to 8 hours, and through drying is achieved in less than 24 hours. The minimum recoating interval is 8 hours.
    How should the product be stored and what is the shelf life?
    The product must be stored in a cool, dry, and well-ventilated indoor warehouse. The standard storage period is half a year (6 months) from the date of manufacture.