Introducing the YP-637 and YP-657 models, premium spray polyurea waterproof coatings offered by top China suppliers and manufacturers. Our two-component elastic coating is expertly formulated with components A and B. Component A consists of a semi prepolymer, created through the interaction of isocyanate with oligomer Diol or ternary alcohol, while Component B features a blend of amino-terminated resin, hydroxyl-terminated resin, amine chain extenders, pigments, and specialized additives. This innovative elastic polyurea is applied using professional-grade spraying equipment, ensuring seamless coverage. The resulting material boasts outstanding mechanical properties, medium resistance, exceptional outdoor aging resistance, and superior adhesion. Trust in our factory's expertise to deliver high-quality solutions for your waterproofing needs in various applications.

    Characteristics of the Product

    • The addition of urea group polymer with crosslinker and terminal amino polyols can significantly improve the material performance
    • Suitable for soaking and waterproof occasions
    • Does not contain harmful substances, and the paint film is non-toxic
    • Strong bonding force with a variety of materials (including metals, ceramics and composites)
    • Spraying molding, no flow hanging

    Product Parameters

    Serial Number Test Item Test Result
    1 Solid content ≥98%
    2 Gel time ≤20s
    3 Tensile strength ≥19 MPa
    4 Elongation ≥550%
    5 Tear strength ≥50 N/m²
    6 Adhesion (pull) MPa 5 MPa
    7 Alkaline resistance (immersed in 20% NaOH solution for 7 days) No change
    8 Water resistance (8h into boiling water) No change
    9 Acid resistance (immersed in 10% HCL solution for 7 days) No change
    10 Hardness Shore A 90–95

    Applications

    Roof waterproofing, villa platform, terrace and other waterproofing protection
    Waterproofing Application 1
    Waterproofing Application 2
    Waterproofing Application 3
    Waterproofing Application 4
    Waterproofing Application 5
    Waterproofing Application 6

    Packing

    Component A: 220 kg   |   Component B: 210 kg

    Storage

    This product should be stored in a cool, dry, ventilated indoor warehouse with a storage period of one year.

    Construction Conditions

    📐 Base Surface Requirements The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
    🌡️ Environmental Temperature & Humidity Requirements The construction environment temperature should be between 5–35°C, and the base surface temperature should be at least 5°C higher than the air dew point temperature. The humidity range should be between 30% and 80%.
    💨 Ventilation Conditions Ventilation should be maintained during construction, but construction should not be carried out when there is strong wind.

    Painting Methods and Requirements

    Mix component B of the coating evenly before use.
    Mixing Ratio:
    A : B = 1 : 1  (Volume Ratio)
    🔧 Professional Construction Requirements Professional construction teams must use professional spraying equipment for construction, and the material temperature during spraying should be controlled between 50–80°C. In general, the next process can be carried out after 12 hours of painting. If the construction interval exceeds 24 hours, a layer of interface agent needs to be applied before construction can proceed. If encountering adverse weather such as rain after coating, a layer of interface agent must be applied before proceeding to the next process. Under normal circumstances, the paint film should be cured for at least 7 days after completion of painting to ensure the best performance of the paint film.

    Suggested Use QTY

    📏 1.2 kg/mm/m²
    🔵 Waterproof national standard thickness 1.5 mm — dosage: 1.8 kg/m²
    🔴 Anti-corrosion national standard thickness 2.0 mm — dosage: 2.4 kg/m²
    Construction Steps:
    1
    First Step: Clean the foundation, fill in the gaps
    2
    Second Step: Roll primer
    3
    Third Step: SPUA Ⅱ Polyurea Spray Construction
    4
    Fourth Step: Brush Waterbased PU Top Coat

    Frequently Asked Questions (FAQ)

    Q What is the solid content of this polyurea coating, and why does it matter?
    The solid content is ≥98%, meaning nearly all of the applied material remains as a cured film with minimal shrinkage. This ensures excellent thickness consistency, superior durability, and optimal waterproofing performance after application.
    Q What is the mixing ratio of Component A and Component B?
    The mixing ratio is A : B = 1 : 1 by volume. It is important to mix Component B evenly before use and to use professional spraying equipment to ensure consistent blending and proper application.
    Q What are the environmental conditions required during construction?
    Construction should be carried out when the ambient temperature is between 5–35°C, and the base surface temperature must be at least 5°C above the dew point. Relative humidity should be between 30% and 80%. Avoid construction in strong wind conditions, though adequate ventilation must be maintained at all times.
    Q How long does the paint film need to cure before it reaches optimal performance?
    Under normal conditions, the next process can begin after 12 hours of painting. However, the paint film should be fully cured for at least 7 days after the completion of painting to ensure the best mechanical and waterproofing performance of the coating.
    Q Is this polyurea coating safe and non-toxic for use in sensitive environments?
    Yes. This product does not contain harmful substances, and the cured paint film is non-toxic. It is suitable for a wide range of waterproofing and anti-corrosion applications, including rooftops, villa platforms, and terraces, where safety is a priority.
    Q What should be done if construction is interrupted for more than 24 hours or if rain occurs after coating?
    If the construction interval exceeds 24 hours, a layer of interface agent must be applied before proceeding with the next process. Similarly, if the coating is exposed to rain or adverse weather conditions after application, a layer of interface agent must be applied before continuing to the next construction step to ensure proper adhesion and coating integrity.