China Suppliers Factory SPUA I Two-Component Spray Polyurea Waterproof Coating for Excellent Performance
Characteristics of the product
- The addition of urea group polymer with crosslinker and terminal amino polyols can significantly improve the material performance
- Suitable for soaking and waterproof occasions
- Does not contain harmful substances, and the paint film is non-toxic
- Strong bonding force with a variety of materials (including metals, ceramics and composites)
- Spraying molding, no flow hanging
Product Parameters
| Serial Number | Test Item | Test result |
|---|---|---|
| 1 | Solid content | ≥94% |
| 2 | Gel time | ≤45s |
| 3 | Tensile strength | ≥10Mpa |
| 4 | Elongation | ≥350% |
| 5 | Tear strength | ≥40N/m2 |
| 6 | Adhesion (pull) Mpa | 5Mpa |
| 7 | Alkaline resistance (immersed in 20%NaOH solution for 7 days) | No change |
| 8 | Water resistance (8h into boiling water) | No change |
| 9 | Acid resistance (immersed in 10%HCL solution for 7d) | No change |
| 10 | Hardness shore A | 85-90 |
Applications (Non-exposed type)
Suitable for external wall waterproof, swimming pool waterproof and other building waterproof and sports stand protection.
Packing
Storage
Construction Conditions
Painting methods and requirements
- Mix component B of the coating evenly before use
- A: B=1:1 (volume ratio)
- Professional construction teams must use professional spraying equipment for construction, and the material temperature during spraying should be controlled between 50~80 ℃.
- In general, the next process can be carried out after 12 hours of painting. If the construction interval exceeds 24 hours, a layer of interface agent needs to be applied before construction can proceed. If encountering adverse weather such as rain after coating, a layer of interface agent must be applied before proceeding to the next process.
- Under normal circumstances, the paint film should be cured for at least 7 days after completion of painting to ensure the best performance of the paint film.
Suggested Use QTY
Construction steps:

First step: clean the foundation, fill in the gaps

Second Step: Roll primer

Third step: SPUA I polyurea spray construction

Forth step: Brush waterbased PU top coat
Frequently Asked Questions (FAQ)
What are the primary applications of this polyurea product?
This product is suitable for external wall waterproofing, swimming pool waterproofing, other building waterproofing needs, and sports stand protection.
What are the requirements for the concrete base surface before application?
The concrete base surface must be cleaned, repaired flat, and polished to a certain roughness. Curing must be complete, with concrete strength reaching C25 or above, and the moisture content must be below 8%.
What is the recommended mix ratio and application temperature?
The volume ratio of Component A to Component B is 1:1. It should be applied using professional spraying equipment, maintaining a material spraying temperature between 50~80 ℃.
How much material is required per square meter?
For waterproofing (national standard thickness of 1.5mm), the suggested dosage is 1.8kg/m². For anti-corrosion (national standard thickness of 2.0mm), the suggested dosage is 2.4kg/m².
What are the recommended storage conditions for this product?
The product should be stored in a cool, dry, and ventilated indoor warehouse. Under these conditions, the storage shelf life is one year.
How long does the paint film require to fully cure?
The paint film should be cured for at least 7 days after the painting process is completed to achieve its optimal physical and chemical performance.