Introducing our high-performance Spray Polyurea Waterproof Coating, available in models YP-636 and YP-65This advanced two-component elastic coating is specifically designed for superior waterproofing applications. Composed of Component A, a semi-prepolymer created from the reaction of isocyanate with oligomer Diol or ternary alcohol, and Component B, which includes amino terminated resin, hydroxyl terminated resin, amine chain extenders, pigments, and essential additives, this product guarantees remarkable elasticity and durability, Manufactured in China, our coating undergoes a professional on-site spraying process that ensures optimal performance. With exceptional mechanical properties, medium resistance, and enhanced outdoor aging resistance, this polyurea material boasts outstanding adhesion for various surfaces. Trust us as your reliable suppliers and factory for high-quality waterproof solutions that meet your needs

    Characteristics of the Product

    • ✦ The addition of urea group polymer with crosslinker and terminal amino polyol significantly improves the material properties
    • ✦ High physical and chemical performance
    • ✦ Wet, water, wear and corrosion resistance
    • ✦ Electric insulation

    Product Parameters

    Serial Number Test Item Test Result
    1 Solid content 100%
    2 Gel time ≤12s
    3 Tensile strength ≥15 MPa
    4 Elongation ≥200%
    5 Tear strength ≥90 N/m²
    6 Adhesion (pull) MPa 5 MPa
    7 Alkaline resistance (immersed in 20% NaOH solution for 7 days) No change
    8 Water resistance (8h into boiling water) No change
    9 Acid resistance (immersed in 10% HCL solution for 7d) No change
    10 Hardness Shore A 50

    Applications

    Suitable for high hardness for pickup lining, mine wear mechanical lining and wear deck.
    不用放产品图
    Application 3
    Application 2

    Packing

    Component A: 220 kg
    Component B: 210 kg

    Storage

    This product should be stored in a cool, dry, ventilated indoor warehouse with a storage period of one year.

    Storage and Transportation

    Sealed and stored in dry, cool, and well ventilated conditions, avoid exposure to sunlight and rain, and keep away from ignition sources. Under the original packaging state and specified storage conditions, the product has a shelf life of 6 months from the production date. If the storage period exceeds, inspection can be carried out according to the items specified in this product standard. If it meets the technical requirements, it can still be used. Please use it as soon as possible after opening, and it must be resealed and stored when not in use. This product does not contain organic solvents and can be transported as a non hazardous material. During transportation, rain and sunlight should be strictly prohibited to avoid severe collisions. Materials should be neatly and stably stacked, and should comply with relevant regulations of the transportation department.

    Construction Conditions

    Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible. Environmental temperature and humidity requirements: The construction environment temperature should be between 5~35 ℃, and the base surface temperature should be at least 5 ℃ higher than the air dew point temperature; The humidity range should be between 30% and 80%. Ventilation conditions: Ventilation should be maintained during construction, but construction should not be carried out when there is strong wind.

    Suggested Use QTY

    1.2 kg/mm/m² — waterproof national standard thickness 1.5mm, single square usage 1.8 kg.
    Construction Steps:
    polyurea spray construction 1
    1
    First Step: Clean the Foundation
    polyurea spray construction 2
    2
    Second Step: Roll Prime
    polyurea spray construction 3
    3
    Third Step: Polyurea Spray Construction

    Frequently Asked Questions (FAQ)

    Q What is the solid content of this polyurea product?
    The product has a solid content of 100%, meaning there are no solvents or water in the formulation. This ensures maximum performance and durability after application.
    Q What are the main application areas for this polyurea coating?
    This product is suitable for high-hardness applications including pickup lining, mine wear mechanical lining, and wear deck surfaces where superior abrasion, corrosion, and chemical resistance are required.
    Q What are the storage and shelf life requirements for this product?
    The product should be stored in a cool, dry, and well-ventilated indoor warehouse away from direct sunlight and ignition sources. Under original packaging and specified conditions, the shelf life is 6 months from the production date. If the storage period is exceeded, the product can still be used after passing re-inspection against the product standard.
    Q What environmental conditions are required during construction?
    The construction environment temperature should be between 5°C and 35°C. The base surface temperature must be at least 5°C above the air dew point temperature. Relative humidity should be between 30% and 80%. Adequate ventilation must be maintained, and construction should not proceed in strong wind conditions.
    Q How much product is needed per square meter of application?
    The recommended usage is 1.2 kg/mm/m². For the waterproof national standard thickness of 1.5 mm, the usage per square meter is 1.8 kg.
    Q Is this product classified as a hazardous material for transportation?
    No. This product does not contain organic solvents and can be transported as a non-hazardous material. However, during transportation, protection from rain and direct sunlight is required, severe collisions should be avoided, and materials must be stacked neatly and stably in compliance with relevant transportation regulations.