Inquiry
Form loading...
China Suppliers Factory SPUA-D50A/B Two-Component Wear-Resistant Polyurea Waterproof Coating
Hot Products

China Suppliers Factory SPUA-D50A/B Two-Component Wear-Resistant Polyurea Waterproof Coating

Introducing the YP-636 and YP-656, high-performance spray polyurea waterproof coatings from a leading China factory. Our two-component elastic coating is expertly formulated with Component A, a semi-prepolymer made through the reaction of isocyanate with oligomer Diol or ternary alcohol, and Component B, which includes amino terminated resin, hydroxyl terminated resin, amine chain extender, pigments, and additives, Designed for on-site application using professional spraying equipment, these elastic polyurea materials provide remarkable mechanical properties, medium resistance, and exceptional outdoor aging resistance. With outstanding adhesion capabilities, our products are perfect for various applications. Trust our factory to deliver top-quality polyurea solutions that meet your waterproofing needs. Connect with the best suppliers in China for a reliable and durable waterproof coating solution

    Characteristics of the Product
    • The addition of urea group polymer with crosslinker and terminal amino polyol significantly improves the material properties
    • High physical and chemical performance
    • Wet, water, wear and corrosion resistance
    • Electric insulation
    Product Parameters
    Serial Number Test Item Test Result
    1 Solid content 100%
    2 Gel time ≤12s
    3 Tensile strength ≥15 MPa
    4 Elongation ≥200%
    5 Tear strength ≥90 N/m²
    6 Adhesion (pull) MPa 5 MPa
    7 Alkaline resistance (immersed in 20% NaOH solution for 7 days) No change
    8 Water resistance (8h into boiling water) No change
    9 Acid resistance (immersed in 10% HCL solution for 7d) No change
    10 Hardness Shore A 50
    Applications
    Suitable for high hardness for pickup lining, mine wear mechanical lining and wear deck.
    Application - Product
    Application 3
    Application 2
    Packing
    Component A: 220 kg   |   Component B: 210 kg
    Storage

    This product should be stored in a cool, dry, ventilated indoor warehouse with a storage period of one year.

    Storage and Transportation

    Sealed and stored in dry, cool, and well ventilated conditions, avoid exposure to sunlight and rain, and keep away from ignition sources. Under the original packaging state and specified storage conditions, the product has a shelf life of 6 months from the production date. If the storage period exceeds, inspection can be carried out according to the items specified in this product standard. If it meets the technical requirements, it can still be used. Please use it as soon as possible after opening, and it must be resealed and stored when not in use. This product does not contain organic solvents and can be transported as a non hazardous material. During transportation, rain and sunlight should be strictly prohibited to avoid severe collisions. Materials should be neatly and stably stacked, and should comply with relevant regulations of the transportation department.

    Construction Conditions

    Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible. Environmental temperature and humidity requirements: The construction environment temperature should be between 5~35 ℃, and the base surface temperature should be at least 5 ℃ higher than the air dew point temperature; The humidity range should be between 30% and 80%. Ventilation conditions: Ventilation should be maintained during construction, but construction should not be carried out when there is strong wind.

    Suggested Use QTY

    1.2 kg/mm/m² — Waterproof national standard thickness 1.5mm, single square usage 1.8 kg.

    Construction Steps:

    polyurea spray construction 1
    First Step: Clean the Foundation
    polyurea spray construction 2
    Second Step: Roll Prime
    polyurea spray construction 3
    Third Step: Polyurea Spray Construction
    Frequently Asked Questions (FAQ)
    • What is the solid content of this polyurea product?
      This polyurea product has a solid content of 100%, meaning it contains no solvents and delivers full material performance upon application.
    • What are the main application areas for this product?
      This product is suitable for high-hardness applications including pickup lining, mine wear mechanical lining, and wear deck surfaces in demanding industrial environments.
    • What are the recommended construction environment conditions?
      Construction should be carried out at an ambient temperature between 5°C and 35°C, with relative humidity between 30% and 80%. The base surface temperature must be at least 5°C above the air dew point. Avoid construction in strong wind conditions.
    • How should this product be stored, and what is its shelf life?
      The product should be stored in a cool, dry, and well-ventilated indoor warehouse, away from sunlight, rain, and ignition sources. The shelf life is 6 months from the production date under original packaging and specified storage conditions. Products exceeding this period may still be used if they pass re-inspection.
    • How much product is needed per square meter for waterproofing?
      The recommended usage is 1.2 kg/mm/m². For the standard waterproof thickness of 1.5mm, approximately 1.8 kg per square meter is required.
    • Is this product resistant to chemicals such as acids and alkalis?
      Yes. Test results confirm no change after immersion in 20% NaOH solution for 7 days (alkaline resistance) and no change after immersion in 10% HCL solution for 7 days (acid resistance), demonstrating excellent chemical resistance performance.