Inquiry
Form loading...
China Suppliers Factory SPUA-D50A/B Two-Component Wear-Resistant Polyurea Material for Waterproof Coating
Hot Products

China Suppliers Factory SPUA-D50A/B Two-Component Wear-Resistant Polyurea Material for Waterproof Coating

Introducing our high-performance spray polyurea waterproof coating, available in models YP-636 and YP-65This state-of-the-art coating is a two-component elastic solution, expertly designed and manufactured in China. Component A consists of a semi-prepolymer created from the reaction of isocyanate with oligomer diol or ternary alcohol, while Component B comprises amino-terminated resin, hydroxyl-terminated resin, amine chain extenders, pigments, and essential additives. As one of the leading suppliers in the industry, we ensure that our elastic polyurea material is applied on-site using professional spraying equipment. This product delivers outstanding mechanical properties, medium resistance, exceptional outdoor aging resistance, and superior adhesion, making it an ideal choice for various applications. Trust our factory to provide you with the highest quality polyurea waterproof coatings tailored to your needs.

    Characteristics of the Product

    • The addition of urea group polymer with crosslinker and terminal amino polyol significantly improves the material properties
    • High physical and chemical performance
    • Wet, water, wear and corrosion resistance
    • Electric insulation

    Product Parameters

    Serial Number Test Item Test Result
    1 Solid content 100%
    2 Gel time ≤12s
    3 Tensile strength ≥15 MPa
    4 Elongation ≥200%
    5 Tear strength ≥90 N/m²
    6 Adhesion (pull) MPa 5 MPa
    7 Alkaline resistance (immersed in 20% NaOH solution for 7 days) No change
    8 Water resistance (8h into boiling water) No change
    9 Acid resistance (immersed in 10% HCL solution for 7 days) No change
    10 Hardness Shore A 50

    Applications

    Suitable for high hardness for pickup lining, mine wear mechanical lining and wear deck.
    Application Example 1
    Application Example 2
    Application Example 3

    Packing

    Component A 220 kg
    Component B 210 kg

    Storage

    This product should be stored in a cool, dry, ventilated indoor warehouse with a storage period of one year.

    Storage and Transportation

    Sealed and stored in dry, cool, and well ventilated conditions, avoid exposure to sunlight and rain, and keep away from ignition sources. Under the original packaging state and specified storage conditions, the product has a shelf life of 6 months from the production date. If the storage period exceeds, inspection can be carried out according to the items specified in this product standard. If it meets the technical requirements, it can still be used. Please use it as soon as possible after opening, and it must be resealed and stored when not in use. This product does not contain organic solvents and can be transported as a non hazardous material. During transportation, rain and sunlight should be strictly prohibited to avoid severe collisions. Materials should be neatly and stably stacked, and should comply with relevant regulations of the transportation department.

    Construction Conditions

    Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.

    Environmental temperature and humidity requirements: The construction environment temperature should be between 5–35 ℃, and the base surface temperature should be at least 5 ℃ higher than the air dew point temperature. The humidity range should be between 30% and 80%.

    Ventilation conditions: Ventilation should be maintained during construction, but construction should not be carried out when there is strong wind.

    Suggested Use QTY

    1.2 kg/mm/m² — waterproof national standard thickness 1.5mm, single square usage 1.8 kg.
    Construction Steps:
    polyurea spray construction 1
    Step 1: Clean the Foundation
    polyurea spray construction 2
    Step 2: Roll Prime
    polyurea spray construction 3
    Step 3: Polyurea Spray Construction

    Frequently Asked Questions

    Q What are the main characteristics of this polyurea product?
    This product features high physical and chemical performance, excellent wet, water, wear and corrosion resistance, as well as electric insulation. It also incorporates urea group polymer with crosslinker and terminal amino polyol to significantly improve material properties.
    Q What is the solid content and gel time of this product?
    The product has a solid content of 100% and a gel time of ≤12 seconds, making it suitable for fast-curing spray applications.
    Q What are the recommended application areas for this product?
    This product is suitable for high hardness applications including pickup lining, mine wear mechanical lining, and wear deck protection.
    Q What are the construction environment requirements?
    The construction environment temperature should be between 5–35 ℃. The base surface temperature should be at least 5 ℃ higher than the air dew point temperature. Humidity should be between 30% and 80%, and proper ventilation must be maintained throughout construction.
    Q How should this product be stored and what is its shelf life?
    The product should be stored sealed in a cool, dry, and well-ventilated environment, away from sunlight, rain, and ignition sources. Under specified storage conditions, the shelf life is 6 months from the production date. After opening, use as soon as possible and reseal when not in use.
    Q How much product is needed per square meter and what are the construction steps?
    The recommended usage is 1.2 kg/mm/m². For the waterproof national standard thickness of 1.5 mm, the usage per square meter is 1.8 kg. Construction involves three steps: (1) clean the foundation surface, (2) apply the primer by rolling, and (3) perform polyurea spray construction.