Inquiry
Form loading...
China Suppliers Factory One-Component Polyurethane Adhesive for Running Track EPDM Playground
Hot Products

China Suppliers Factory One-Component Polyurethane Adhesive for Running Track EPDM Playground

Introducing our top-quality one-component polyurethane adhesive, expertly formulated in our China-based factory using a precise blend of isocyanate and polyether polyol, enriched with carefully selected additives. This adhesive is known for its exceptional mechanical properties, ensuring high bond strength and remarkable wear resistance, making it ideal for various applications. Additionally, it boasts outstanding aging resistance, guaranteeing long-lasting performance. As a leading supplier in the industry, we emphasize environmentally friendly practices, assuring you that our product aligns with green standards. Choose our polyurethane adhesive for reliable and sustainable bonding solutions that meet all your needs

    Characteristics of the Product
    • Cured at room temperature.
    • Excellent physical and chemical properties, good adhesion.
    • Convenient construction, high efficiency, one construction can meet the design thickness requirements.
    Product Parameters
    Test Item Index
    Physical Indicators NCO content (%) 5.5 ± 0.2
    Appearance (20℃) Pale yellow viscous liquid
    Operation time (min/25℃) 60–90 min
    Usage temperature (℃) Normal temperature
    Surface drying time (h/25℃) 6–12
    Solidification time (h/25℃) 24–48
    Physical Indicators Viscosity (MPa.S/30℃) 2500 ± 200
    Tensile strength (MPa, 20% rubber content EPDM granules) ≥ 0.4
    Elongation at break (%, 20% rubber content EPDM granules) ≥ 40
    Applications

    Applicable to the floor, color sand floor, marble floor, road surface color change, etc.

    Laboratory, research and development room, pharmaceutical factory, parking lot, subway station, supermarket, warehouse, heavy-load industrial plant, etc.

    Polyurethane adhesive PU binder application 1
    Polyurethane adhesive PU binder application 2
    Polyurethane adhesive PU binder application 3
    Packing
    🛢️ 200 kgs / drum
    Storage
    🏪 Sealed storage of coatings in dry, cool, and well ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.
    Construction Conditions
    • 1 Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
    • 2 Environmental temperature and humidity requirements: The environmental temperature at the construction site should be above 5℃, and construction can only be carried out when the relative humidity is less than 85%.
    • 3 Ventilation conditions: Ventilation should be maintained during construction.
    Operation Methods and Requirements
    • a Select materials.
    • b Recommended ratio of single square dosage: ≥ 0.9 kg glue, 1 ~ 1.1 kg 0.5–2mm size granules, 0.3 ~ 0.4 kg rubber powder, 0.06 kg color paste.
    • c The granules size is recommended at 0.5–2mm. When the glue temperature is low in winter, the viscosity problem is solved by heating the glue to ensure the covering and bond strength. First, the glue and color paste should be fully stirred evenly, and then add granules and red rubber powder and stir fully and evenly. Combined with the site situation, an appropriate amount of environmental protection diluent can be added to adjust the construction viscosity — do not adjust too thin, to prevent the material from penetrating into the particles and excessive atomization when spraying, resulting in insufficient slurry packaging on the granule surface.
    • d After mixing evenly, spray once in both directions.
    Suggested Use Qty
    📦 Single square meter dosage ≥ 1.3 kg
    ❓ Frequently Asked Questions (FAQ)
    Q What is the curing method of this polyurethane PU binder?
    A This PU binder cures at room temperature. The surface drying time is 6–12 hours at 25℃, and full solidification is achieved within 24–48 hours under the same conditions, making it convenient for efficient on-site construction.
    Q What are the typical application scenarios for this PU binder?
    A This product is widely applicable to floors, color sand floors, marble floors, and road surface color changes. It is also suitable for laboratories, pharmaceutical factories, parking lots, subway stations, supermarkets, warehouses, and heavy-load industrial plants.
    Q What are the environmental requirements for construction?
    A Construction should be carried out when the environmental temperature is above 5℃ and the relative humidity is less than 85%. Good ventilation must be maintained throughout the construction process to ensure safe and effective application.
    Q What are the base surface requirements before applying the PU binder?
    A The concrete base surface must be cleaned, repaired flat, and polished to a certain roughness. The concrete curing must be completed, with strength reaching C25 or above and a moisture content of less than 8%. The next construction process should begin as soon as possible after base surface preparation.
    Q How should this PU binder be stored?
    A The product should be stored in sealed containers in a dry, cool, and well-ventilated environment. It must be kept away from direct sunlight, rain, and any sources of fire to maintain product quality and safety.
    Q What is the recommended dosage and mixing ratio for this PU binder?
    A The recommended single square meter dosage is ≥ 1.3 kg. For the mixing ratio, use ≥ 0.9 kg glue, 1–1.1 kg of 0.5–2mm EPDM granules, 0.3–0.4 kg rubber powder, and 0.06 kg color paste per square meter. Ensure all components are thoroughly mixed before spraying in both directions.