To be a century-old enterprise, to be the world's respect for China's manufacturing products
Inquiry
Form loading...
China Suppliers Factory for Hot Spray Polyurea Waterproof Coating - Durable Surface Protection and Industrial Floors
Hot Products

China Suppliers Factory for Hot Spray Polyurea Waterproof Coating - Durable Surface Protection and Industrial Floors

Introducing our premium Spray Polyurea Waterproof Coating SII, a two-component elastic coating expertly designed for professional spraying applications. Manufactured by a leading factory in China, this robust solution comprises Component A and Component B, ensuring exceptional performance and durability, ● Component A is crafted from a semi-prepolymer synthesized by high-quality isocyanate and oligomer diol/triol, providing an excellent foundation for the coating, ● Component B consists of a blend of amino-terminated resin, hydroxyl-terminated resin, amine chain extender, pigments, and functional additives, delivering an unrivaled protective layer, This top-tier polyurea coating forms a complete elastic film through on-site spraying with specialized equipment, making it ideal for a variety of surfaces. It boasts outstanding mechanical strength, medium resistance, exceptional outdoor weathering capabilities, and superior adhesion to substrates. Trust in our China-based suppliers to provide this advanced coating solution that meets your waterproofing needs

    Characteristics of the Product

    • Ultra-fast curing; continuous spraying available on curved surfaces, vertical walls and top surfaces without sagging.
    • Excellent waterproof performance to fully isolate substrates from water erosion.
    • Outstanding physical & chemical properties, strong adhesion to various base materials.
    • High construction efficiency; designed thickness can be achieved in one single pass.
    • Integral, dense and seamless coating film.
    • Mechanized spraying construction with stable, controllable film quality.
    • Solvent-free & heavy-metal-free, eco-friendly formula.
    • 100% solid content, zero VOC emission.
    • Wide service temperature range: -45 ℃ ~ 150 ℃.
    • Continuous compact seamless film, practical and attractive appearance.

    Product Parameters

    No. Test Item Technical Requirement Test Result
    1 Solid Content (%) ≥98 99
    2 Gel Time (s) ≤45 16
    3 Surface Dry Time (s) ≤120 20
    4 Tensile Strength (MPa) ≥16.0 16.24
    5 Elongation at Break (%) ≥450 460
    6 Tear Strength (N/mm) ≥50 66
    7 Low-temperature Bending (℃) ≤-40 -40
    8 Water Impermeability 0.4 MPa, impermeable for 2h Impermeable
    9 Heating Elongation (%) Elongation / contraction ≤1.0 0.4
    10 Bond Strength (MPa) ≥2.5 3
    11 Water Absorption (%) ≤5.0 0.5
    12 Thermal Aging & Artificial Weathering Appearance No cracks & deformation No cracks & deformation
    13 Thermal Aging Performance    
      Tensile Strength Retention Rate (%) 80–150 97
      Elongation at Break (%) ≥400 411
      Low-temperature Bending (℃) ≤-35 -35, no crack
    14 Alkali Resistance Performance    
      Tensile Strength Retention Rate (%) 80–150 103
      Elongation at Break (%) ≥400 413
      Low-temperature Bending (℃) ≤-35 -35, no crack
    15 Acid Resistance Performance    
      Tensile Strength Retention Rate (%) 80–150 99
      Elongation at Break (%) ≥400 410
      Low-temperature Bending (℃) ≤-35 -35, no crack
    16 Salt Resistance Performance    
      Tensile Strength Retention Rate (%) 80–150 97
      Elongation at Break (%) ≥400 409
      Low-temperature Bending (℃) ≤-35 -35, no crack
    17 Artificial Weathering Performance    
      Tensile Strength Retention Rate (%) 80–150 83
      Elongation at Break (%) ≥400 408
      Low-temperature Bending (℃) ≤-35 -35, no crack
    18 Hardness (Shore A) ≥80 85
    19 Abrasion Loss (750g/500r, mg) ≤30 1
    20 Impact Resistance (kg·m) ≥1.0 1.0 kg·m, intact

    Application Scope & Construction Method

    • Chemical, petroleum & petrochemical industry: workshop floors, storage tanks, neutralization tanks, drainage trenches.
    • Environmental facilities: landfill sites, sewage treatment tanks, waste gas filtration towers.
    • Factory & warehouse floors: anti-corrosion and wear-resistant protection.
    • Steel structures: metal pipelines, bridge decks, ship decks and platforms.
    • Building waterproofing: roof waterproofing, exterior wall waterproofing & renovation.
    • Municipal facilities: sports grandstands, anti-seepage wear-resistant flooring.
    • Aquatic venues: water parks, swimming pools, aquaculture ponds.
    S II (1)
    S II (2)
    S II (7)
    S II (4)
    S II (5)
    S II (6)

    Packaging Specification

    Component A: 220 kg per drum Component B: 210 kg per drum

    Storage

    • Store in sealed, cool, dry and ventilated warehouse; avoid direct sunlight, rain and all ignition sources.
    • Shelf life: 6 months under original sealed packaging and specified storage conditions.
    • Expired material can be reused only if re-inspection meets all technical indexes.
    • Use up quickly once opened; re-seal tightly for storage if unused.
    • Solvent-free product, classified as non-hazardous goods for transportation.
    • Strictly prevent rain, sunlight and violent collision during transit; stack materials neatly and stably, complying with transport regulations.

    Construction Conditions

    1. Substrate Requirements

    Concrete base shall be cleaned, leveled and polished to form proper roughness. Concrete curing must be fully completed with strength ≥ C25 and moisture content <8%. Proceed to next process immediately after substrate treatment.

    2. Ambient Temperature & Humidity
    • Construction temperature: 5 ~ 35 ℃
    • Substrate surface temperature shall be at least 5 ℃ higher than dew point
    • Relative humidity: 30% ~ 80%
    • Keep ventilation; stop construction under strong wind.

    Coating Method & Requirements

    • Stir Component B thoroughly before use; volume mixing ratio A:B = 1:1.
    • Professional spraying equipment is mandatory; material temperature controlled at 50 ~ 80 ℃ during spraying.
    • Next process can be carried out after 12 hours curing. If interval exceeds 24 hours, apply interface agent before re-spraying.
    • If rain occurs after coating, apply interface agent before subsequent construction.
    • Full film curing time: minimum 7 days to achieve optimal comprehensive performance.

    Recommended Consumption

    • Standard dosage: 1.2 kg per square meter per mm thickness
    • National standard waterproof thickness 1.5 mm: 1.8 kg/㎡
    • National standard anti-corrosion thickness 2.0 mm: 2.4 kg/㎡

    Safety & Labor Protection

    • Read product manual and warning labels fully before operation; master construction specifications.
    • No open flame, welding or smoking on construction site; maintain good ventilation.
    • Although solvent-free, spray mist will be generated during spraying. Wear gas mask and full protective gear to avoid inhalation and direct skin contact.
    • Flush splashed coating on skin with detergent, soap and plenty of clean water immediately. For eye splashes, rinse thoroughly with water and seek medical treatment promptly.
    • Fully cured dry film is non-toxic under normal application conditions. For more details, please contact Shandong Century Union New Materials Technology Co., Ltd.
    Construction Steps
    First step clean the foundation, fill in the gaps
    First step: Clean the foundation, fill in the gaps
    Second Step, Roll primer
    Second Step: Roll primer
    Third step self-leveling cold polyurea floor construction
    Third step: Self-leveling cold polyurea floor construction
    Forth step Brush waterbased PU top coat
    Forth step: Brush waterbased PU top coat

    Frequently Asked Questions (FAQ)

    What are the primary characteristics of this polyurea product?
    It features ultra-fast curing (without sagging on vertical or curved surfaces), excellent waterproofing, strong adhesion, zero VOC emissions (100% solid content), and operates within a wide temperature range of -45 ℃ to 150 ℃.
    What is the mixing ratio and recommended application method?
    The volume mixing ratio is Component A:B = 1:1. It requires professional spraying equipment, and the material temperature must be controlled at 50 ~ 80 ℃ during the spraying process.
    What are the concrete substrate requirements before application?
    The concrete base must be clean, leveled, and polished to a proper roughness. The curing process must be fully completed with a concrete strength of ≥ C25 and a moisture content of less than 8%.
    What is the recommended consumption for waterproofing and anti-corrosion?
    The standard dosage is 1.2 kg/㎡ per mm of thickness. For national standard waterproofing (1.5 mm thickness), the consumption is 1.8 kg/㎡. For national standard anti-corrosion (2.0 mm thickness), the consumption is 2.4 kg/㎡.
    How should the product be stored and what is its shelf life?
    It should be stored in a sealed, cool, dry, and ventilated warehouse away from direct sunlight, rain, and ignition sources. Under original sealed conditions, the shelf life is 6 months.
    Is the cured coating film safe?
    Yes, once the film is fully cured and dry, it is non-toxic under normal application conditions. During application, however, proper labor protection like gas masks and protective gear must be worn due to the spray mist.