China Suppliers Factory for Basketball Pickleball Badminton Tennis Silicon PU Sport Court Material
Hot Products

China Suppliers Factory for Basketball Pickleball Badminton Tennis Silicon PU Sport Court Material

This high-quality single-component polyurethane court material is a product of advanced manufacturing by a leading supplier in China. Formulated through the reaction of isocyanate and polyether polyol, this durable material is enhanced with reinforcing agents, defoamers, and other additives to ensure superior performance. Our factory produces a polyurethane solution that boasts excellent mechanical properties, outstanding flexibility, and remarkable weather and water resistance. With exceptional leveling capabilities and a smooth, bright finish, this product is ideal for creating high-performance sports courts. Choose our China-based suppliers for reliable and innovative materials that meet your athletic surface needs

    Characteristics of the Product

    Cured at room temperature.
    Excellent physical and chemical properties, all kinds of substrates have good adhesion.
    Convenient construction, high efficiency.
    Manual scraping and coating construction, simple, convenient and controllable.
    Single component material is easy to use.

    Product Parameters

    Appearance Green viscous liquid
    Viscosity/30℃ 4000-6000Mpa·s
    NCO content /% /
    Operation time 0.5-1h (The higher the temperature, the shorter the operation time)
    Curing time 18-72h (The higher the temperature and humidity, the shorter the time, and vice versa)
    Tensile strength 1.3-1.7Mpa
    Elongation at break 100-200%

    Applications

    Schools, stadiums and other common used a variety of fields.

    sport court application
    sport court surfacing
    sport court stadium

    Packing

    30kgs/drum

    Storage

    Sealed storage of coatings in dry, cool, and well ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.

    Construction Conditions

    Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
    Environmental temperature and humidity: The environmental temperature at the construction site should be above 5 ℃, and construction can only be carried out when the relative humidity is less than 85%.
    Ventilation conditions: Ventilation should be maintained during construction.

    Operation Methods & Requirements

    Add 0.7%-1% water to QT and stir well. During construction, in order to ensure the adhesion between layers, sanding is performed (Note: sanding floating dust must be cleaned with a vacuum cleaner). Roller coating sealing primer, after the primer is completely cured, thin scraping with a leather rake, the thickness of 1~1.5㎜ is appropriate, the scraping time interval before curing (generally about 12 hours, depending on the weather conditions on the site) until the required thickness.

    Note: It is recommended to use all within 40 minutes after mixing, otherwise the viscosity will increase sharply, affecting the continued use. After curing can proceed to the next process. It is completely cured in 18 hours at normal temperature. If there is bad weather such as rain after painting, an interface agent must be painted before the next process.

    Suggested Use Qty

    Single square meter dosage ≥1.3-1.5kg/mm

    Frequently Asked Questions (FAQ)

    What is the mixing ratio for this product?
    You should add 0.7% to 1% water to the QT material and stir thoroughly before application.
    How long do I have to use the mixture after stirring?
    It is recommended to use the entire mixture within 40 minutes, as the viscosity increases sharply after this time.
    What are the concrete base requirements?
    The base must be clean, flat, polished to roughness, have a strength of C25+, and a moisture content below 8%.
    What is the standard curing time?
    At normal temperatures, it fully cures in about 18 hours, though complete curing can range from 18 to 72 hours depending on humidity and temperature.
    Can I apply this coating in cold weather?
    Construction should only be carried out when the environmental temperature is above 5℃ and relative humidity is below 85%.
    How should the product be stored?
    Store in a sealed container in dry, cool, and well-ventilated conditions, away from direct sunlight, rain, and fire sources.