Inquiry
Form loading...
China Suppliers Factory Direct Two-Component Hand-Brush Cold Polyurea for Durable Coating Solutions
Hot Products

China Suppliers Factory Direct Two-Component Hand-Brush Cold Polyurea for Durable Coating Solutions

YP683/YP685 is a high-performance, solvent-free, two-component polyurea elastic material designed for easy application with a hand brush. Manufactured in China, this innovative product is crafted from semi-prepolymers, amino-terminated polyethers, delayed diamine chain extenders, and various raw materials, ensuring exceptional quality. Even in temperatures as low as -5°C, our hand-brush polyurea cures rapidly, forming a dense, non-foaming coating that provides outstanding mechanical properties and medium resistance. With excellent outdoor aging resistance and superior adhesion, YP683/YP685 is the ideal choice for contractors seeking reliable coatings. As a leading supplier and factory in the industry, we are dedicated to providing top-notch products that meet your needs

    Characteristics of the Product
    • Can cure at room temperature, surface dry within 12 hours, and dry within 24 hours.
    • Excellent physical and chemical properties, with good adhesion to various substrates.
    • Convenient construction, extremely high efficiency, can achieve the design thickness requirements (hundreds of micrometers to several centimeters) in one construction.
    • Good leveling performance, overall film formation, dense and seamless coating.
    • Using manual scraping or roller coating construction, professional, convenient, and controllable.
    • Free from solvents, heavy metals, and environmentally friendly.
    • 100% solid, free of volatile organic compounds (VOCs), environmentally friendly.
    • The coating is continuous, dense, seamless, aesthetically pleasing and practical.
    • Has excellent anti-corrosion performance, effectively protecting the substrate from corrosion.
    Product Parameters
    Item Number YP683 / YP685
    Solid Content % 100
    Work Time (min) 10–15 mins
    Surface Dry Time (h) < 4
    Actual Dry Time (h) < 24
    Hardness (Shore A) 80
    Tensile Strength (MPa) 7–8 MPa
    Elongation at Break (%) 300
    Tear Strength 40 N/m²
    Adhesion (Pull) MPa 2 MPa
    Applications
    • Waterproofing protection for roofs, swimming pools, water parks, etc.
    • Production workshop anti-corrosion flooring and warehouse floor anti-corrosion and wear-resistant protection.
    • Silent floors in schools, hospitals, kindergartens, and dust-free workshop floors.
    • Can board sports venues such as basketball courts.
    Packing
    📦  20 kgs / drum
    Storage
    🏪  Sealed storage of coatings in dry, cool, and well ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.
    Construction Conditions
    • Base Surface: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
    • Temperature & Humidity: The environmental temperature at the construction site should be above 5℃, and construction can only be carried out when the relative humidity is less than 85%.
    • Ventilation: Ventilation should be maintained during construction.
    Operation Methods and Requirements
    • Mixing Ratio A:B = 1:1 (mass ratio) — No solvent allowed. Pour component B into a mixing bucket and add the same mass of component A by electronic weighing. Stir thoroughly for 2–3 minutes to prevent uneven mixing at the bottom of the bucket, which could result in local non-solidification of the floor. The prepared polyurea coating should be used up within 15 minutes.
    • During construction, first apply solvent-free epoxy anti-corrosion sealing primer. After the primer is completely cured, polish the area to ensure inter-layer adhesion. Polishing floating dust must be cleaned with a vacuum cleaner.
    • After cleaning and polishing the floating dust, use solvent-free polyurea intermediate coating combination material, mix evenly in proportion, then pour this combination material onto the floor and scrape it evenly with a trowel (3mm or 5mm trowel can be selected according to thickness requirements).
    • After 24 hours of curing, the next process can proceed. If the construction interval exceeds 48 hours, a layer of interface agent needs to be applied before construction can proceed.
    • After curing, if encountering adverse weather such as rain, a layer of interface agent must be applied before proceeding to the next process.
    • Under normal circumstances, the coating film should be cured for at least 7 days after completion of painting to ensure optimal performance of the paint film.
    Suggested Use QTY
    📐 1.2 kg / mm / m²
    🔵 Waterproof national standard thickness 1.5mm — single square usage: 1.8 kg
    🟠 Anti-corrosion national standard thickness 2.0mm — usage: 2.4 kg
    Construction Steps:
    Frequently Asked Questions (FAQ)
    What is the mixing ratio for YP683/YP685 two-component cold polyurea?
    The mixing ratio is A:B = 1:1 by mass. No solvents are permitted. Use electronic weighing for accuracy and stir thoroughly for 2–3 minutes. The prepared mixture must be used within 15 minutes.
    How long does YP683/YP685 polyurea take to cure?
    Surface drying occurs within 4 hours, and full drying is achieved within 24 hours at room temperature. For optimal film performance, allow at least 7 days of curing after the final coat is applied.
    Is this polyurea coating environmentally friendly?
    Yes. YP683/YP685 is 100% solid content, completely free of solvents, heavy metals, and volatile organic compounds (VOCs), making it a safe and environmentally responsible coating solution.
    What are the recommended application thickness and usage quantities?
    The standard usage rate is 1.2 kg per mm per m². For waterproofing at 1.5mm thickness, approximately 1.8 kg/m² is required. For anti-corrosion applications at 2.0mm thickness, approximately 2.4 kg/m² is required.
    What construction conditions are required for proper application?
    The ambient temperature must be above 5℃ and relative humidity below 85%. The concrete substrate should have a strength of C25 or above and moisture content below 8%. Adequate ventilation must be maintained throughout the application process.
    How should YP683/YP685 polyurea coating be stored?
    Store in sealed containers in a dry, cool, and well-ventilated area. Keep away from direct sunlight, rain, and all sources of fire or ignition. Proper storage ensures product quality and extends shelf life.