Looking for high-quality polyurethane running track material? Our two-component hand brush polyurethane track material, sourced from reliable suppliers in China, is the perfect solution. This innovative product is created through a precise reaction between isocyanate and polyether polyol, enhanced with reinforcing agents and other additives for superior performance. Our factory ensures that this material boasts exceptional mechanical properties, optimal leveling, and a seamless, continuous coating. The result is a dense, attractive, and practical running track that meets all your needs. Choose our polyurethane track material for durability and aesthetic appeal, and experience the best from trusted China suppliers

    Characteristics of the Product
    • Cured at room temperature.
    • Excellent physical and chemical properties, all kinds of substrates have good adhesion.
    • Convenient construction, high efficiency, one construction can meet the design thickness requirements.
    • Using manual scraping or rolling coating construction, simple, convenient and controllable.
    Product Parameters
    Test Data Part A Part B
    Appearance Red viscous liquid Colorless clear liquid
    Viscosity / 30℃ 20000–30000 Mpa·s 3500–4000 Mpa·s
    NCO Content / % / 7.5 ± 0.2
    Operation Time 0.5–2h (The higher the temperature, the shorter the operation time)
    Curing Time 18–72h (The higher the temperature and humidity, the shorter the time, and the longer vice versa)
    Tensile Strength 1.0–1.5 Mpa
    Elongation at Break 100–150%
    Applications
    🏫 Schools, stadiums and other common used plastic track.
    Running track (5)
    Running track (6)
    Running track (4)
    Packing
    Part A 250 kg — Iron Drum
    Part B 200 kg — Iron Drum
    Storage
    🏪 Sealed storage of coatings in dry, cool, and well ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.
    Construction Conditions
    • 1 Base Surface Requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
    • 2 Environmental Temperature & Humidity: The environmental temperature at the construction site should be above 5℃, and construction can only be carried out when the relative humidity is less than 85%.
    • 3 Ventilation Conditions: Ventilation should be maintained during construction.
    Operation Methods and Requirements
    • 1 Part A and Part B are stirred evenly according to the ratio of 5:1, and the appropriate proportion of catalyst is added according to the different temperature and humidity.
    • 2 During construction, in order to ensure the adhesion between layers, sanding is performed (Note: sanding floating dust must be cleaned with a vacuum cleaner). Roll on solventless epoxy sealing primer. After the primer is completely cured, pour the uniform mixture of Part A and Part B onto the floor, scrape it evenly with a trowel (3mm or 5mm bread knife can be used according to the thickness), and proceed to the next process after curing. It is completely cured in 18 hours at normal temperature. If there is bad weather such as rain after painting, an interface agent must be painted before the next process.
    Suggested Use Quantity
    📐
    Single square meter dosage ≥ 1.3 kg/mm Ensure adequate application per square meter to meet design thickness requirements.
    Frequently Asked Questions (FAQ)
    Q What is the mixing ratio of Part A to Part B?
    Part A and Part B should be mixed at a ratio of 5:1. An appropriate proportion of catalyst should also be added depending on the ambient temperature and humidity at the time of construction.
    Q How long does it take for the product to fully cure?
    At normal temperature, the product is completely cured in approximately 18–72 hours. Higher temperature and humidity will shorten the curing time, while lower temperature and humidity will extend it.
    Q What are the base surface requirements before applying the coating?
    The concrete base surface must be cleaned, repaired flat, and polished to a proper roughness. Concrete curing must be complete with strength reaching C25 or above, and moisture content must be less than 8%.
    Q What environmental conditions are required during construction?
    Construction should only be carried out when the ambient temperature is above 5℃ and the relative humidity is below 85%. Adequate ventilation must be maintained throughout the construction process.
    Q How should this product be stored?
    The product should be stored in a sealed container in a dry, cool, and well-ventilated environment. Keep away from direct sunlight, rain, and any sources of fire or ignition.
    Q What is the recommended dosage per square meter?
    The recommended dosage is ≥ 1.3 kg/mm per square meter. This ensures the coating meets the required design thickness for durable and long-lasting performance on plastic tracks and similar surfaces.