Inquiry
Form loading...
China Suppliers Factory Basketball Pickleball Badminton Tennis Silicon PU Sport Courts Material
Hot Products

China Suppliers Factory Basketball Pickleball Badminton Tennis Silicon PU Sport Courts Material

Introducing our high-quality single-component polyurethane court material, manufactured by a leading factory in China. This innovative product is carefully formulated through the reaction of isocyanate and polyether polyol, ensuring optimal performance. Enhanced with reinforcing agents, defoamers, and various additives, our polyurethane court material boasts exceptional mechanical properties, flexibility, and durability. It provides outstanding weather resistance and water resistance, along with superior leveling, smoothness, and brightness on the surface. As trusted suppliers in the industry, we are committed to delivering top-notch materials that meet the needs of sports facilities and court construction projects across various applications

    Characteristics of the Product

    • Cured at room temperature.
    • Excellent physical and chemical properties, all kinds of substrates have good adhesion.
    • Convenient construction, high efficiency.
    • Manual scraping and coating construction, simple, convenient and controllable.
    • Single component material is easy to use.

    Product Parameters

    Test Data QT
    Appearance Green viscous liquid
    Viscosity / 30℃ 4000–6000 Mpa·s
    NCO Content / % /
    Operation Time 0.5–1h (The higher the temperature, the shorter the operation time)
    Curing Time 18–72h (The higher the temperature and humidity, the shorter the time, and the longer vice versa)
    Tensile Strength 1.3–1.7 Mpa
    Elongation at Break 100–200%

    Applications

    Schools, stadiums and other common used a variety of fields.

    Sport Court Application 1
    Sport Court Application 2
    Sport Court Application 3

    Packing

    📦 30 kgs / drum

    Storage

    ⚠️ Sealed storage of coatings in dry, cool, and well-ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.

    Construction Conditions

    • 1 Base Surface Requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
    • 2 Environmental Temperature & Humidity: The environmental temperature at the construction site should be above 5℃, and construction can only be carried out when the relative humidity is less than 85%.
    • 3 Ventilation Conditions: Ventilation should be maintained during construction.

    Operation Methods and Requirements

    Add 0.7%–1% water to QT and stir well. During construction, in order to ensure the adhesion between layers, sanding is performed (Note: sanding floating dust must be cleaned with a vacuum cleaner). Roller coating sealing primer, after the primer is completely cured, thin scraping with a leather rake, the thickness of 1~1.5㎜ is appropriate, the scraping time interval before curing (generally about 12 hours, depending on the weather conditions on the site) until the required thickness.

    (It is recommended to use all within 40 minutes after mixing, otherwise the viscosity will increase sharply, affecting the continued use). After curing can proceed to the next process. It is completely cured in 18 hours at normal temperature. If there is bad weather such as rain after painting, an interface agent must be painted before the next process.

    Suggested Use Quantity

    📐 Single square meter dosage ≥ 1.3–1.5 kg/mm

    Frequently Asked Questions (FAQ)

    Q What is the curing time of this product under normal conditions?
    The product cures at room temperature within 18–72 hours. The higher the temperature and humidity, the shorter the curing time. Under standard conditions (normal temperature), complete curing takes approximately 18 hours.
    Q What substrates is this product compatible with?
    This product offers excellent adhesion to a wide variety of substrates. It is especially suitable for concrete base surfaces used in sports courts, schools, and stadiums. The concrete strength should reach C25 or above, with a moisture content of less than 8%.
    Q How should the product be prepared before application?
    Add 0.7%–1% water to QT and stir thoroughly. It is recommended to use the entire mixture within 40 minutes after mixing, as the viscosity will increase sharply beyond that time, affecting continued use.
    Q What are the environmental requirements for construction?
    Construction should be carried out when the ambient temperature is above 5℃ and the relative humidity is below 85%. Adequate ventilation must be maintained throughout the construction process.
    Q How should this product be stored?
    Store in a sealed container in a dry, cool, and well-ventilated environment. Avoid exposure to direct sunlight and rain. Keep away from all sources of fire and heat.
    Q What should be done if it rains after the coating has been applied?
    If bad weather such as rain occurs after painting, an interface agent must be applied before proceeding to the next process. This ensures proper adhesion between layers and maintains coating integrity.