China SRT-A/B Self-Leveling Polyurea Floor Material - Suppliers and Factory Direct Quality Products
Characteristics of the product
- Can cure at room temperature, surface dry within 2 hours, and dry within 12 hours.
- Excellent physical and chemical properties, with good adhesion to various substrates.
- The construction is convenient and highly efficient, and the design thickness requirements (hundreds of micrometers to several centimeters) can be achieved in one construction.
- Good leveling performance, overall film-forming, continuous, dense, seamless coating, beautiful and practical.
- Using manual scraping and coating construction, it is simple, convenient, and controllable.
- Free from solvents, heavy metals, and environmentally friendly.
- 100% solid content, free of volatile organic compounds (VOCs), environmentally friendly.
- Has excellent anti-corrosion performance, effectively protecting the substrate from corrosion.
Product Parameters
| Serial Number | Test Item | Test Result |
|---|---|---|
| 1 | Solid content | 100% |
| 2 | Work time | 10-15 mins |
| 3 | Tensile strength | 13Mpa |
| 4 | Elongation | ≥100% |
| 5 | Adhesion (pull) Mpa | 2Mpa |
| 6 | Hardness shore A | D60 |
| 7 | Surface dry time (h) | ≤8 |
| 8 | Actual dry time(h) | ≤24 |
| 9 | Akron abrasion (cm3) | 0.15 |
Applications
- Indoor floors, terraces, balconies, corridors, and other environments;
- Parking lot floor;
- Silent flooring for schools, hospitals, etc., dust-free workshop flooring, anti-corrosion flooring for production workshops, and anti-corrosion and wear-resistant protection for warehouse flooring;
- Micro elastic silent self leveling floor and impact resistant self leveling floor.
Packing
A = 16kgs / drum | B = 4kgs / drum
Storage
- The materials should be stored in a dry, cool, and well ventilated environment, avoiding direct sunlight and rain, and kept away from sources of fire.
- Under the original packaging condition and specified storage conditions, the shelf life of the product is 12 months from the production date. After opening, please use it as soon as possible. If not in use, it must be resealed and stored.
- This product does not contain organic solvents and can be transported as a non hazardous material. During transportation, rain and sunlight should be strictly prohibited to avoid severe collisions with materials.
- It should be neatly and steadily stacked, and comply with relevant regulations of the transportation department.
Construction Conditions
- Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed and the strength reaches to C25 or above, with a moisture content below 8%. After processing the base surface, the next process should be carried out as soon as possible.
- Environmental temperature and humidity requirements: The environmental temperature at the construction site should be above 5 ℃, and construction can only be carried out when the relative humidity is less than 85%.
- Ventilation conditions: Ventilation should be maintained during construction.
Construction Methods and Requirements
- Before use, pour component B into a mixing bucket and add the corresponding mass of component A by electronic weighing in proportion. Stir thoroughly for 2-3 minutes to prevent uneven mixing at the bottom of the bucket and local non solidification of the floor. Ready to use and prepare, the prepared polyurea self leveling should be used up within 15 minutes. (Attention: The mixed material should not be placed in the bucket. It should be poured onto the foundation of the construction to avoid rapid solidification of the material)
- During construction, in order to ensure interlayer adhesion, polishing treatment should be carried out (note: polishing floating dust must be cleaned with a vacuum cleaner). Then, a solvent-free epoxy sealing primer should be applied by rolling. After the primer is completely cured, the polyurea self leveling composite material should be mixed evenly in proportion. Then, pour this composite material onto the floor and scrape it evenly with a trowel (3mm or 5mm trowel can be selected according to thickness requirements).
- After the surface dry absolutely, normally about 12 hours, then please add the colored PU topcoat. Mix the two components of topcoat A and B thoroughly for 2-3 minutes, and then apply them evenly on the floor using a high-quality, non depilatory short hair roller (suggestion: 1. Use tape to remove impurities; 2. Cover the roller with stockings is also ok). Suggested coating area: approximately 0.2kgs/square meters. Attention: During construction, it is necessary to adhere to the principle of "dedicated personnel for ingredient preparation", "multiple shortages and continuous supply"; the paint should be used up within 30 minutes.
- Using tools: Dust free grinding machine, industrial vacuum cleaner, angle grinder, airless spraying machine (optional), steamed bun knife, roller barrel, defoaming drum, brush, measuring instrument, electric mixer, textured paper, etc.
- In order to prevent contamination of the construction edge and maintain a completely straight line (or boundary with the unpainted part) at the processing area, protective tape should be applied, and the ingredients should be kept clean to avoid impurities. Construction equipment and tools should be kept clean.
- Try not to arrange construction on summer nights to avoid mosquitoes falling and affecting the surface aesthetics of the coating.
- Do not pour self leveling materials into the sewer.
- Smoking is strictly prohibited at the construction site.
- Under normal circumstances, the paint film should be cured for at least 7 days after completion of painting to ensure optimal performance of the paint film.
Suggested Use QTY & Construction Steps
Standard Dosage: 1.2kg/mm/m²
Thickness ≥ 1.5mm: Single square dosage ≥ 1.8kg.
Thickness ≥ 2.0mm: Single square dosage ≥ 2.4kg.
Thickness ≥ 1.5mm: Single square dosage ≥ 1.8kg.
Thickness ≥ 2.0mm: Single square dosage ≥ 2.4kg.

First step: Clean the foundation, fill in the gaps

Second Step: Roll primer

Third step: Self-leveling cold polyurea floor construction

Fourth step: Brush waterbased PU top coat
Frequently Asked Questions (FAQ)
1. How long does it take for the product to dry?
The product can cure at room temperature. It becomes surface dry within 2 hours and will be fully dry within 12 hours.
2. Is this floor material environmentally friendly?
Yes, it is highly environmentally friendly. It features 100% solid content and is completely free from solvents, heavy metals, and volatile organic compounds (VOCs).
3. What are the requirements for the base surface before application?
The concrete base surface must be cleaned, repaired flat, and polished. The concrete curing must be completed with a strength of C25 or above, and the moisture content should be strictly below 8%.
4. What is the shelf life and how should the product be stored?
The shelf life is 12 months from the production date in its original packaging. It should be stored in a dry, cool, and well-ventilated environment, kept away from direct sunlight, rain, and fire sources.
5. How much material is needed per square meter?
The standard dosage is 1.2kg/mm/m². For a thickness of ≥ 1.5mm, you will need ≥ 1.8kg per square meter. For a thickness of ≥ 2.0mm, you will need ≥ 2.4kg per square meter.
6. When can I apply the PU topcoat, and how long does it take to fully cure?
You should apply the colored PU topcoat after the surface is absolutely dry, which normally takes about 12 hours. After the entire painting process is completed, the paint film should be cured for at least 7 days to ensure optimal performance.