Inquiry
Form loading...
China Factory Suppliers of Basketball, Pickleball, Badminton, Tennis Silicon PU Sport Court Material
Hot Products

China Factory Suppliers of Basketball, Pickleball, Badminton, Tennis Silicon PU Sport Court Material

Discover our premium single-component polyurethane court material, expertly formulated by leading China suppliers and produced in state-of-the-art factories. This high-quality product is created through a precise reaction between isocyanate and polyether polyol, enhanced with reinforcement agents, defoamers, and other additives. Renowned for its exceptional mechanical properties, the material offers unmatched flexibility, weather resistance, and water resistance. Additionally, it delivers excellent leveling, surface smoothness, and brightness, making it the ideal choice for sports courts. Elevate your court surfaces with our reliable polyurethane solutions today!

    Characteristics of the Product

    • Cured at room temperature.
    • Excellent physical and chemical properties, all kinds of substrates have good adhesion.
    • Convenient construction, high efficiency.
    • Manual scraping and coating construction, simple, convenient and controllable.
    • Single component material is easy to use.

    Product Parameters

    Test Data QT
    Appearance Green viscous liquid
    Viscosity / 30℃ 4000–6000 Mpa·s
    NCO Content / % /
    Operation Time 0.5–1h (The higher the temperature, the shorter the operation time)
    Curing Time 18–72h (The higher the temperature and humidity, the shorter the time, and the longer vice versa)
    Tensile Strength 1.3–1.7 Mpa
    Elongation at Break 100–200%

    Applications

    Schools, stadiums and other common used a variety of fields.

    Sport Court Application 1
    Sport Court Application 2
    Sport Court Application 3

    Packing

    📦 30 kgs / drum

    Storage

    ⚠️
    Sealed storage of coatings in dry, cool, and well ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.

    Construction Conditions

    • 1 Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
    • 2 Environmental temperature and humidity requirements: The environmental temperature at the construction site should be above 5℃, and construction can only be carried out when the relative humidity is less than 85%.
    • 3 Ventilation conditions: Ventilation should be maintained during construction.

    Operation Methods and Requirements

    Add 0.7%–1% water to QT and stir well. During construction, in order to ensure the adhesion between layers, sanding is performed (Note: sanding floating dust must be cleaned with a vacuum cleaner). Roller coating sealing primer, after the primer is completely cured, thin scraping with a leather rake, the thickness of 1~1.5㎜ is appropriate, the scraping time interval before curing (generally about 12 hours, depending on the weather conditions on the site) until the required thickness.

    💡 Note: It is recommended to use all within 40 minutes after mixing, otherwise the viscosity will increase sharply, affecting the continued use. After curing, proceed to the next process. It is completely cured in 18 hours at normal temperature. If there is bad weather such as rain after painting, an interface agent must be painted before the next process.

    Suggested Use Qty

    📐 Single square meter dosage ≥ 1.3–1.5 kg/mm

    Frequently Asked Questions (FAQ)

    Q What is the curing time for this product at normal temperature?
    At normal temperature, the product is completely cured within 18 hours. However, full curing can take 18–72 hours depending on temperature and humidity — higher temperature and humidity shorten the curing time.
    Q What are the minimum environmental requirements for construction?
    Construction should only be carried out when the environmental temperature is above 5℃ and the relative humidity is less than 85%. Good ventilation must also be maintained throughout the construction process.
    Q How should this product be mixed before use?
    Add 0.7%–1% water to QT and stir thoroughly. It is recommended to use the entire mixture within 40 minutes after mixing, as viscosity will increase sharply over time and may affect application quality.
    Q What are the base surface requirements before applying this coating?
    The concrete base surface must be cleaned, repaired flat, and polished to an appropriate roughness. The concrete strength should reach C25 or above, and moisture content must be below 8%. Proceed to the next process as soon as possible after surface preparation.
    Q How should this product be stored properly?
    Store the coating in sealed containers in a dry, cool, and well-ventilated environment. Avoid exposure to direct sunlight and rain. Keep away from all sources of fire and ignition at all times.
    Q What should be done if it rains after the coating has been applied?
    If there is rain or bad weather after painting, an interface agent must be applied before proceeding to the next construction process to ensure proper adhesion and coating integrity.